Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40856
Well Classification: OW Status: PR - 12/13/2024
Well Name/No:BEIERLE #26-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/13/2024
FacilityID:440481LocationID:440489
County:WELD #123Location:NWNE 26 1N66W 6
Field:WATTENBERG - #90750Elevation:5120 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FNL  1669 FELLat/Long: 40.028279 / -104.740921Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.028279 / -104.740921Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/23/2021
End Date: 11/2/2021
Reported: 12/22/2021
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/13/2024             Measured TD: 16519 ft.    Vertical TD: 7391 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/13/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/1/2022
Proposed Top PZ Location:Sec:26 Twp: 1N 66W Footage: 814 FNL  1530 FEL
Bottom Hole Location:Sec:26 Twp: 1N 66W Footage: 814 FNL  1530 FEL
Proposed Depth/Form:16243 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16233 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1919, Top: , Bottom: 16233 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6940 ft., Depth: 12189 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 6941 ft., Bottom: 12189 ft.

Wellbore Completed
Completion Date:6/6/2021
Spud Date:1/6/2021Spud Date Is:ACTUAL
Measured TD:16519 ft.Measured PB depth:16467 ft.
True Vertical TD:7391 ft.True Vertical PB depth:7391 ft.
Top PZ Location:Sec:26 Twp: 1N 66WFootage: 2610 FNL  360 FEL
Bottom Hole Location:Sec:23 Twp: 1N 66WFootage: 52 FNL  371 FEL
Log Types:
Log Types:CBL, LWD/MWD, Per Rule 317.p Exception, Resistivity Logs have been run on the BEIERLE 26-4HZ API#05-123-40875
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27.17 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1904 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 837, Top: 0 ft., Bottom: 1904 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16512 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1665, Top: 990 ft., Bottom: 16519 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5049 ft.
SUSSEX5438 ft.
NIOBRARA8180 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/13/2024                Interval Top: 8601 ft.    Interval Bottom: 16383 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/16/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/20/2024Treatment End Date:6/21/2024
Treatment Summary:Treatment Rate 2-16 bpm Surfactant - 1745 gals Acid Package - 8,431 gals Biocide Package - 566 gals Scale Inhibitor - 734 gals Chemical Diverter - 0 Lbs Linear Gel - 0 gals Breaker - 0 lbs Crosslinker - 0 gals Total fluid w/ Water 15830.00 bbls
Total fluid used in treatment (bbls):15830Max pressure during treatment (psi):3750
Total gas used in treatment (mcf):0Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):201Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):592
Fresh water used in treatment (bbls):15557Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:10/23/2021Treatment End Date:11/3/2021
Treatment Summary:476 BBL 20% HCR-7000 WL ACID; 76 BBL 7.5% HCL ACID; 12,060 BBL PUMP DOWN; 209,512 BBL SLICKWATER; 222,124 BBL TOTAL FLUID; 6,243,873 LBS WHITE 40/70 OTTAWA/ST. PETERS; 6,243,873 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):222124Max pressure during treatment (psi):7910
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):552Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):3000Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):218572Disposition method For flowback:RECYCLE
Total proppant used (lbs):6243873Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 288
BBLS_OIL 362
BTU_GAS 1370
CALC_BBLS_H2O 288
CALC_BBLS_OIL 362
CALC_GOR 981
CALC_MCF_GAS 355
CASING_PRESS 2000
GRAVITY_OIL 50
MCF_GAS 355
TUBING_PRESS 1400
Perforation Data:
Interval Top:8601 ft.# Of Holes:870
Interval Bottom:16383 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)11644
Total Gas Produced (MCF)50322
GOR4321
GOR DeterminationBOE
Average BOE per Day55.190
Average MCFE per Day320.103

 Federal Financial Assurance  i 

 Tribal Well  i No