|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2021 Measured TD: 12960 ft. Vertical TD: 7681 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/14/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 2N 67W | Footage: 97 FSL 1860 FEL | | Bottom Hole Location: | Sec:28 Twp: 2N 67W | Footage: 460 FNL 1875 FEL | | Proposed Depth/Form: | 12977 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1258 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1258 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8270 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 820, Top: 0 ft., Bottom: 8270 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7039 ft., Depth: 12977 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 5/6/2015 | | Spud Date: | 1/13/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12960 ft. | Measured PB depth: | 12908 ft. | | True Vertical TD: | 7681 ft. | True Vertical PB depth: | 7681 ft. | | Top PZ Location: | Sec:33 Twp: 2N 67W | Footage: 22 FNL 2008 FEL | | Bottom Hole Location: | Sec:28 Twp: 2N 67W | Footage: 485 FNL 1882 FEL | | Log Types: | CBL, LWD, (IND in 123-10849, 123-07313, 123-23823) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: ACTUAL | | Cement: | Sacks: 32, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1348 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1348 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8154 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 230 ft., Bottom: 8154 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7148 ft., Depth: 12956 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 7148 ft., Bottom: 12956 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4589 ft. | | | | | SHANNON | 4594 ft. | | | | | SHARON SPRINGS | 7486 ft. | | | | | NIOBRARA | 7573 ft. | | | | | FORT HAYS | 8021 ft. | | | | | CODELL | 8095 ft. | | | | | CARLILE | 10533 ft. | | | |
Formation CLCDFH Formation Classification: OW Status: PR - 11/1/2021 Interval Top: 8173 ft. Interval Bottom: 12877 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 10/31/2015 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/25/2015 | Treatment End Date: | 9/28/2015 | | Treatment Summary: | PERF AND FRAC FROM 8173-12,877.
179 BBL ACID, 84,710 BBL SLICKWATER, 1,792 BBL WATER, - 86,680 BBL TOTAL FLUID
2,612,800# 40/70 OTTAWA/ST. PETERS, - 2,612,800# TOTAL SAND.
ENTERED: CODELL 8173-10534, 11353-11586, 12730-12877
CARLILE 10534-11353, 11586-12569
FT HAYS 12569-12730
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
(SEE ATTACHMENT)
| | Total fluid used in treatment (bbls): | 86681 | Max pressure during treatment (psi): | 7299 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 16 | | Total acid used in treatment (bbls): | 179 | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 1804 | | Fresh water used in treatment (bbls): | 86502 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2612800 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1752 | | BBLS_OIL | 61 | | BTU_GAS | 1348 | | CALC_BBLS_H2O | 1752 | | CALC_BBLS_OIL | 61 | | CALC_GOR | 1738 | | CALC_MCF_GAS | 106 | | CASING_PRESS | 1450 | | GRAVITY_OIL | 49 | | MCF_GAS | 106 |
| | Perforation Data: | | Interval Top: | 8173 ft. | # Of Holes: | 348 | | Interval Bottom: | 12877 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1621 |
| Total Gas Produced (MCF) | 34632 |
| GOR | 21364 |
| GOR Determination | MCFE |
| Average BOE per Day | 20.772 |
| Average MCFE per Day | 120.462 |
| Federal Financial Assurance | i | |
|
|