Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40835
Well Classification: OW Status: PR - 11/1/2023
Well Name/No:GREEN #2N-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2023
FacilityID:440413LocationID:305939
County:WELD #123Location:NWNW 8 1N65W 6
Field:WATTENBERG - #90750Elevation:4971 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:356FNL  928 FWLLat/Long: 40.072309 / -104.693966Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.072310 / -104.693965Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/15/2016
End Date: 3/28/2016
Reported: 4/28/2016
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2023             Measured TD: 13450 ft.    Vertical TD: 7211 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/12/2016
Proposed Top PZ Location:Sec:5 Twp: 1N 65W Footage: 305 FSL  738 FWL
Bottom Hole Location:Sec:8 Twp: 1N 65W Footage: 24 FSL  623 FWL
Proposed Depth/Form:13436 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1497 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 0 ft., Bottom: 1497 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7744 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 820, Top: 0 ft., Bottom: 7744 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6745 ft., Depth: 13436 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/23/2015
Spud Date:1/21/2015Spud Date Is:ACTUAL
Measured TD:13450 ft.Measured PB depth:13345 ft.
True Vertical TD:7211 ft.True Vertical PB depth:7208 ft.
Top PZ Location:Sec:5 Twp: 1N 65WFootage: 305 FSL  738 FWL
Bottom Hole Location:Sec:8 Twp: 1N 65WFootage: 24 FSL  623 FWL
Log Types:CBL, LWD, (IND in 123-23718, 123-08690)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1556 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 604, Top: 0 ft., Bottom: 1556 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13437 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1540, Top: 0 ft., Bottom: 13437 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4621 ft.
SHARON SPRINGS7266 ft.
NIOBRARA7307 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2023                 Interval Top: 7903 ft.    Interval Bottom: 13335 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/25/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/15/2016Treatment End Date:3/28/2016
Treatment Summary:"PERF AND FRAC FROM 7903-13,335. 452 BBL ACID, 188,009 BBL SLICKWATER, 5,114 BBL WATER, - 193,576 BBL TOTAL FLUID 865,154# 100 MESH OTTAWA/ST. PETERS, 4,439,790# 40/70 GENOA/SAND HILLS, - 5,304,944# TOTAL SAND."
Total fluid used in treatment (bbls):193576Max pressure during treatment (psi):7735
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):452Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7536
Fresh water used in treatment (bbls):193123Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5304945Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/5/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 452
BBLS_OIL 134
BTU_GAS 1479
CALC_BBLS_H2O 452
CALC_BBLS_OIL 134
CALC_GOR 1269
CALC_MCF_GAS 170
CASING_PRESS 1850
GRAVITY_OIL 48
MCF_GAS 170
Perforation Data:
Interval Top:7903 ft.# Of Holes:648
Interval Bottom:13335 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2885
Total Gas Produced (MCF)49213
GOR17058
GOR DeterminationMCFE
Average BOE per Day30.971
Average MCFE per Day179.663

 Federal Financial Assurance  i 

 Tribal Well  i No