Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40737
Well Classification: OW Status: PR - 7/1/2017
Well Name/No:BURROUGHS SOUTH #10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2017
FacilityID:440220LocationID:440224
County:WELD #123Location:SENE 14 7N65W 6
Field:WATTENBERG - #90750Elevation:4944 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2241FNL  230 FELLat/Long: 40.574342 / -104.621097Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.574343 / -104.621097Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/1/2017
End Date: 6/21/2017
Reported: 7/5/2017
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2017             Measured TD: 17375 ft.    Vertical TD: 7368 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/4/2016
Proposed Top PZ Location:Sec:14 Twp: 7N 65W Footage: 2009 FNL  519 FEL
Bottom Hole Location:Sec:15 Twp: 7N 65W Footage: 1904 FNL  490 FWL
Proposed Depth/Form:17354 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17354 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1600, Top: 1500 ft., Bottom: 17354 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7500 ft., Depth: 17354 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/31/2017
Spud Date:10/23/2016Spud Date Is:ACTUAL
Measured TD:17375 ft.Measured PB depth:17354 ft.
True Vertical TD:7368 ft.True Vertical PB depth:7371 ft.
Top PZ Location:Sec:14 Twp: 7N 65WFootage: 2009 FNL  519 FEL
Bottom Hole Location:Sec:15 Twp: 7N 65WFootage: 1904 FNL  490 FWL
Log Types:CBL, MUD, MWD/LWD, TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1572 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1572 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 5.5 in., Top: 0 ft., Depth: 17360 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2800, Top: 125 ft., Bottom: 17360 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3962 ft.NN
SUSSEX4521 ft.NN
SHANNON5276 ft.NN
SHARON SPRINGS7017 ft.NN
NIOBRARA7052 ft.NN
FORT HAYS7473 ft.NN
CODELL7578 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/8/2018                  Interval Top: 12908 ft.    Interval Bottom: 13288 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2018Treatment End Date:N/A
Treatment Summary:Producing interval: 12908'-13288'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12908 ft.# Of Holes:72
Interval Bottom:13288 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/8/2018                  Interval Top: 10284 ft.    Interval Bottom: 10695 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2018Treatment End Date:N/A
Treatment Summary:Producing interval: 10284'-10695'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10284 ft.# Of Holes:72
Interval Bottom:10695 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/8/2018                  Interval Top: 10128 ft.    Interval Bottom: 10928 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2018Treatment End Date:N/A
Treatment Summary:Producing intervals: 10128'-10284'; 10695'-10928'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10128 ft.# Of Holes:59
Interval Bottom:10928 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/8/2018                  Interval Top: 7764 ft.    Interval Bottom: 17309 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2018Treatment End Date:N/A
Treatment Summary:Producing intervals: 7764'-10128'; 10928'-12908'; 13288'-17309'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7764 ft.# Of Holes:1490
Interval Bottom:17309 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/2/2017                  Interval Top: 7764 ft.    Interval Bottom: 17309 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:7/29/2017Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/1/2017Treatment End Date:6/21/2017
Treatment Summary:48 stage plug and perf; 161100 total bbls of fluid pumped: 153420 bbls fresh water, 12 bbls 15% HCL acid, and 7668 bbls recycled water pumped; 9630580 total lbs of 30/50 proppant pumped.
Total fluid used in treatment (bbls):161100Max pressure during treatment (psi):8306
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):7668Total flowback volume recovered (bbls):35543
Fresh water used in treatment (bbls):153420Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9630580Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7505 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2017Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1638
BBLS_OIL 81
BTU_GAS 1308
CALC_BBLS_H2O 1638
CALC_BBLS_OIL 81
CALC_GOR 1049
CALC_MCF_GAS 85
CASING_PRESS 541
GRAVITY_OIL 40
MCF_GAS 85
TUBING_PRESS 842
Perforation Data:
Interval Top:7764 ft.# Of Holes:1693
Interval Bottom:17309 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2917
Total Gas Produced (MCF)8254
GOR2829
GOR DeterminationBOE
Average BOE per Day11.877
Average MCFE per Day68.888

 Federal Financial Assurance  i 

 Tribal Well  i No