|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2020 Measured TD: 10030 ft. Vertical TD: 5936 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/19/2016 | Prop Depth/Form: | 9940 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-480 , Unit Acreage: 3200, Drill Unit: Sec. 25-27, 34, 35 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 216, Top: 0 ft., Bottom: 550 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6307 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 480, Top: , Bottom: 6307 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6207 ft., Depth: 10055 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/1/2016 | Spud Date: | 12/27/2015 | Spud Date Is: | ACTUAL | Measured TD: | 10030 ft. | Measured PB depth: | 10018 ft. | True Vertical TD: | 5936 ft. | True Vertical PB depth: | 5936 ft. | Top PZ Location: | Sec:34 Twp: 9N 59W | Footage: 1308 FNL 945 FWL | Depth | Bottom Hole Location: | Sec:34 Twp: 9N 59W | Footage: 331 FSL 1000 FWL | Depth | Log Types: | CBL, MWD/LWD, (IND on 123-40640) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 609 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 271, Top: 0 ft., Bottom: 609 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6320 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 466, Top: 146 ft., Bottom: 6313 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6178 ft., Depth: 10020 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Casing: | String Type: 2ND LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: 6097 ft., Depth: 9976 ft., Weight: 9.3 , Citings Type: ACTUAL | Cement: | Sacks: 140, Top: 6097 ft., Bottom: 9976 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 575 ft. | | | | PARKMAN | 3362 ft. | | | | SUSSEX | 4014 ft. | | | | SHANNON | 4437 ft. | | | | NIOBRARA | 6150 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2020 Interval Top: 6364 ft. Interval Bottom: 9933 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/13/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/6/2016 | Treatment End Date: | 6/18/2016 | Treatment Summary: | Niobrara frac'd with: 4/25/2016: 579,300 lb Ottawa sand, 844,429 gal silverstem and slickwater and 6/18/2016: 5,952,687 lb Ottawa Sand, 6,778,216 gal silverstem and slickwater | Total fluid used in treatment (bbls): | 181492 | Max pressure during treatment (psi): | 5598 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 30 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.99 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 11755 | Fresh water used in treatment (bbls): | 181492 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 6531987 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6122 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/16/2016 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1036 | BBLS_OIL | 271 | BTU_GAS | 1377 | CALC_BBLS_H2O | 1036 | CALC_BBLS_OIL | 271 | CALC_GOR | 679 | CALC_MCF_GAS | 184 | CASING_PRESS | 4 | GRAVITY_OIL | 52 | MCF_GAS | 184 | TUBING_PRESS | 445 |
| Perforation Data: | Interval Top: | 6364 ft. | # Of Holes: | 1923 | Interval Bottom: | 9933 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2642 |
Total Gas Produced (MCF) | 11783 |
GOR | 4459 |
GOR Determination | BOE |
Average BOE per Day | 12.765 |
Average MCFE per Day | 74.059 |
Federal Financial Assurance | i | |
|
|