|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 3/16/2016 Measured TD: 8348 ft. Vertical TD: 8330 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 3/16/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/17/2017 | | Proposed Top PZ Location: | Sec:19 Twp: 10N 57W | Footage: 658 FSL 2627 FEL | | Bottom Hole Location: | Sec:19 Twp: 10N 57W | Footage: 359 FSL 2619 FEL | | Proposed Depth/Form: | 8348 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | Not available | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: BLIN , Formation: BLAINE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ENRD , Formation: ENTRADA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LSTKA , Formation: LOWER SATANKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LYKNS , Formation: LYKINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PRMN , Formation: PERMIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 109 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1597 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1597 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8322 ft., Weight: 29 , Citings Type: PLANNED | | Cement: | Sacks: 154, Top: 6256 ft., Bottom: 8322 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6256 ft., Weight: 29 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 660 ft., Bottom: 6256 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/14/2014 | | Spud Date: | 12/6/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 8348 ft. | Measured PB depth: | 8276 ft. | | True Vertical TD: | 8330 ft. | True Vertical PB depth: | 8258 ft. | | Top PZ Location: | Sec:19 Twp: 10N 57W | Footage: 658 FSL 2627 FEL | | Bottom Hole Location: | Sec:19 Twp: 10N 57W | Footage: 359 FSL 2619 FEL | | Log Types: | LWD, MUD, cement bond, casing evaluation, caliper, gamma ray, triple combination logs | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1597 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1597 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8322 ft., Weight: 29 , Citings Type: ACTUAL | | Cement: | Sacks: 154, Top: 6256 ft., Bottom: 8322 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 660 ft., Depth: 6256 ft., Bottom: 6256 ft., Sacks: 420, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1207 ft. | | | | | PIERRE | 1671 ft. | | N | N | | HYGIENE | 3268 ft. | | N | N | | SHARON SPRINGS | 5503 ft. | | N | N | | NIOBRARA | 5506 ft. | | N | N | | FORT HAYS | 5796 ft. | | | | | CODELL | 5834 ft. | | N | N | | CARLILE | 5845 ft. | | N | N | | GREENHORN | 5966 ft. | | N | N | | GRANEROS | 6013 ft. | | N | N | | D SAND | 6308 ft. | | N | N | | HUNTSMAN | 6345 ft. | | N | N | | J SAND | 6406 ft. | | | | | SKULL CREEK | 6475 ft. | | N | N | | LAKOTA | 6629 ft. | | N | N | | DAKOTA | 6662 ft. | | N | N | | MORRISON | 6753 ft. | | N | N | | SUNDANCE | 7012 ft. | | N | N | | ENTRADA | 7046 ft. | | N | N | | LYKINS | 7065 ft. | | N | N | | MINNEKAHTA | 7316 ft. | | N | N | | BLAINE | 7399 ft. | | N | N | | LYONS | 7465 ft. | | N | N | | LOWER SATANKA | 7532 ft. | | | | | WOLFCAMP | 7776 ft. | | N | N | | AMAZON | 7853 ft. | | N | N | | COUNCIL GROVE | 7940 ft. | | N | N | | NEVA | 8034 ft. | | N | N | | ADMIRE | 8102 ft. | | N | N | | PENNSYLVANIAN | 8204 ft. | | N | N | | VIRGIL | 8213 ft. | | N | N | | SHAWNEE | 8236 ft. | | N | N |
Formation AMZN Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7860 ft. Interval Bottom: 7915 ft.| Completed Information for Formation AMAZON | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | AMAZON | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/19/2015 | Treatment End Date: | N/A | | Treatment Summary: |
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation AMZN. |
| | Perforation Data: | | Interval Top: | 7860 ft. | # Of Holes: | 330 | | Interval Bottom: | 7915 ft. | Hole Size: | 0.375 in. |
|
Formation LSTKA Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7535 ft. Interval Bottom: 7610 ft.| Completed Information for Formation LOWER SATANKA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LOWER SATANKA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LSTKA. |
| | Perforation Data: | | Interval Top: | 7535 ft. | # Of Holes: | 450 | | Interval Bottom: | 7610 ft. | Hole Size: | 0.375 in. |
|
Formation LYNS Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7465 ft. Interval Bottom: 7520 ft.| Completed Information for Formation LYONS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LYONS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LYNS. |
| | Perforation Data: | | Interval Top: | 7465 ft. | # Of Holes: | 270 | | Interval Bottom: | 7520 ft. | Hole Size: | 0.375 in. |
|
Formation BLIN Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7455 ft. Interval Bottom: 7465 ft.| Completed Information for Formation BLAINE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | BLAINE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation BLIN. |
| | Perforation Data: | | Interval Top: | 7455 ft. | # Of Holes: | 60 | | Interval Bottom: | 7465 ft. | Hole Size: | 0.375 in. |
|
Formation LYKNS Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7065 ft. Interval Bottom: 7080 ft.| Completed Information for Formation LYKINS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LYKINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LYKNS. |
| | Perforation Data: | | Interval Top: | 7065 ft. | # Of Holes: | 96 | | Interval Bottom: | 7080 ft. | Hole Size: | 0.375 in. |
|
Formation DJINJ Formation Classification: DSPW Status: IJ - 3/16/2016 Interval Top: 7060 ft. Interval Bottom: 7915 ft.| Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/19/2015 | Treatment End Date: | N/A | | Treatment Summary: | 1/08/2015 Pump 330 gals 15% HCL (Entrada, Permian, Lykins, Blaine, Lyons, and Satanka formations treated together).
Step Rate Test for UIC application
1/19/2015 Pump 7560 gals 15%HCL, 20 bbls rock salt
(Entrada, Permian, Lykins, Blaine, Lyons, Satanka, and Amazon formations treated together)
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DJINJ. |
| | Perforation Data: | | Interval Top: | 7060 ft. | # Of Holes: | 1230 | | Interval Bottom: | 7915 ft. | Hole Size: | 0.375 in. |
|
Formation ENRD Formation Classification: DSPW Status: CM - 4/24/2015 Interval Top: 7060 ft. Interval Bottom: 7065 ft.| Completed Information for Formation ENTRADA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ENTRADA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/19/2015 | Treatment End Date: | N/A | | Treatment Summary: |
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation ENRD. |
| | Perforation Data: | | Interval Top: | 7060 ft. | # Of Holes: | 24 | | Interval Bottom: | 7065 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|