Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40576
Well Classification: OW Status: SI - 9/1/2021
Well Name/No:DOCHEFF #12C-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2021
FacilityID:439851LocationID:439849
County:WELD #123Location:NESW 14 3N68W 6
Field:WATTENBERG - #90750Elevation:4934 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2152FSL  1646 FWLLat/Long: 40.224842 / -104.973764Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.224835 / -104.973754Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/19/2016
End Date: 6/22/2016
Reported: 7/29/2016
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2021             Measured TD: 12977 ft.    Vertical TD: 7304 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:14 Twp: 3N 68W Footage: 2035 FSL  500 FWL
Bottom Hole Location:Sec:15 Twp: 3N 68W Footage: 2035 FSL  460 FWL
Proposed Depth/Form:13002 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13011 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1387, Top: , Bottom: 13011 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6691 ft., Depth: 13002 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/29/2016
Spud Date:3/5/2016Spud Date Is:ACTUAL
Measured TD:12977 ft.Measured PB depth:12875 ft.
True Vertical TD:7304 ft.True Vertical PB depth:7301 ft.
Top PZ Location:Sec:14 Twp: 3N 68WFootage: 2032 FSL  431 FWL
Bottom Hole Location:Sec:15 Twp: 3N 68WFootage: 2015 FSL  472 FWL
Log Types:CBL, MWD, (IND in 123-40578)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 32, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1897 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 694, Top: 0 ft., Bottom: 1897 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12968 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 0 ft., Bottom: 12968 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4148 ft.
SHARON SPRINGS7040 ft.
NIOBRARA7118 ft.
FORT HAYS7600 ft.
CODELL7958 ft.
CARLILE11418 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/27/2017                Interval Top: 11417 ft.    Interval Bottom: 12779 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/27/2017Treatment End Date:N/A
Treatment Summary:CARLILE: 11,417-12,176; 12,777-12,779
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11417 ft.# Of Holes:311
Interval Bottom:12779 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/27/2017                Interval Top: 7958 ft.    Interval Bottom: 12777 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/27/2017Treatment End Date:N/A
Treatment Summary:CODELL: 7958-11,417; 12,176-12,777
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7958 ft.# Of Holes:311
Interval Bottom:12777 ft.Hole Size:0.46 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  SI - 9/1/2021                  Interval Top: 7741 ft.    Interval Bottom: 12779 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/7/2016Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/19/2016Treatment End Date:6/22/2016
Treatment Summary:PERF AND FRAC FROM 7741-12,779. 10 BBL 7.5% HCL ACID, 92,599 BBL SLICKWATER, 3,110 BBL WATER, - 95,719 BBL TOTAL FLUID 424,840# 100 MESH PREMIUM, 2,271,220# 40/70 PREMIUM, - 2,696,060# TOTAL SAND. ENTERED FT HAYS: 7741-7958; CODELL: 7958-11,417; 12,176-12,777 CARLILE: 11,417-12,176; 12,777-12,779 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):95719Max pressure during treatment (psi):7209
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):10Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2540
Fresh water used in treatment (bbls):95709Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2696060Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 359
BBLS_OIL 80
BTU_GAS 1375
CALC_BBLS_H2O 359
CALC_BBLS_OIL 80
CALC_GOR 1500
CALC_MCF_GAS 120
CASING_PRESS 1600
GRAVITY_OIL 48
MCF_GAS 120
Perforation Data:
Interval Top:7741 ft.# Of Holes:311
Interval Bottom:12779 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/27/2017                Interval Top: 7741 ft.    Interval Bottom: 7958 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/27/2017Treatment End Date:N/A
Treatment Summary:FT HAYS: 7741-7958
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7741 ft.# Of Holes:311
Interval Bottom:7958 ft.Hole Size:0.46 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
08/31/2021
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No