Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40574
Well Classification: OW Status: SI - 5/1/2024
Well Name/No:Noco #LC25-730
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2024
FacilityID:439848LocationID:439844
County:WELD #123Location:SWSE 25 9N59W 6
Field:WILDCAT - #99999Elevation:4901 ft.
Planned Location:500FSL  1583 FELLat/Long: 40.715840 / -103.922130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.715820 / -103.922270Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/10/2015
End Date: 9/11/2015
Reported: 11/4/2015
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 5/1/2024             Measured TD: 10640 ft.    Vertical TD: 5995 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/13/2016
Prop Depth/Form:10612 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-480 , Unit Acreage: 3200, Drill Unit: All25,26,27,34,35
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1320 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1320 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6346 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 430, Top: , Bottom: 6346 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6196 ft., Depth: 10616 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/25/2015
Spud Date:5/19/2015Spud Date Is:ACTUAL
Measured TD:10640 ft.Measured PB depth:10628 ft.
True Vertical TD:5995 ft.True Vertical PB depth:5995 ft.
Top PZ Location:Sec:25 Twp: 9N 59WFootage: 906 FSL  1465 FELDepth
Bottom Hole Location:Sec:25 Twp: 9N 59WFootage: 335 FNL  1313 FELDepth
Log Types:CBL, MWD/LWD, Resistivity
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.9 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1366 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 602, Top: 0 ft., Bottom: 1366 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6344 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 572, Top: 910 ft., Bottom: 6344 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6237 ft., Depth: 10630 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE705 ft.
PARKMAN3379 ft.
SUSSEX4096 ft.
SHANNON4919 ft.
NIOBRARA6015 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 5/1/2024                  Interval Top: 6506 ft.    Interval Bottom: 10529 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/25/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/10/2015Treatment End Date:9/11/2015
Treatment Summary:Frac'd the Niobrara w/ 3658828 gals of Silverstim and Slick Water with 2995200#'s Ottawa sand.
Total fluid used in treatment (bbls):87114Max pressure during treatment (psi):4042
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):3353Total flowback volume recovered (bbls):594
Fresh water used in treatment (bbls):83761Disposition method For flowback:RECYCLE
Total proppant used (lbs):2995200Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6252 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 532
BBLS_OIL 380
BTU_GAS 1362
CALC_BBLS_H2O 532
CALC_BBLS_OIL 380
CALC_GOR 360
CALC_MCF_GAS 137
CASING_PRESS 942
GRAVITY_OIL 42
MCF_GAS 137
TUBING_PRESS 408
Perforation Data:
Interval Top:6506 ft.# Of Holes:0
Interval Bottom:10529 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)935
Total Gas Produced (MCF)7870
GOR8417
GOR DeterminationBOE
Average BOE per Day6.312
Average MCFE per Day36.589

 Federal Financial Assurance  i 

 Tribal Well  i No