Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40337
Well Classification: OW Status: PR - 3/13/2022
Well Name/No:JOHNSON #01N-65W-30-4H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/13/2022
FacilityID:439164LocationID:439158
County:WELD #123Location:SESW 30 1N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:231FSL  1758 FWLLat/Long: 40.015686 / -104.709871Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.015686 / -104.709871Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/18/2021
End Date: 12/31/2021
Reported: 1/24/2022
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/13/2022             Measured TD: 17793 ft.    Vertical TD: 7183 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/13/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:7/9/2021
Proposed Top PZ Location:Sec:30 Twp: 1N 65W Footage: 460 FSL  1259 FWL
Bottom Hole Location:Sec:19 Twp: 1N 65W Footage: 460 FNL  1259 FWL
Proposed Depth/Form:17282 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2599 , Unit Acreage: 640, Drill Unit: S 30: W/2, 19: W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2274 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 970, Top: 0 ft., Bottom: 2274 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17657 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2210, Top: 0 ft., Bottom: 17657 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7440 ft., Depth: 11899 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/1/2021
Spud Date:5/17/2021Spud Date Is:ACTUAL
Measured TD:17793 ft.Measured PB depth:17711 ft.
True Vertical TD:7183 ft.True Vertical PB depth:7183 ft.
Top PZ Location:Sec:30 Twp: 1N 65WFootage: 330 FSL  1265 FWL
Bottom Hole Location:Sec:19 Twp: 1N 65WFootage: 354 FNL  1251 FWL
Log Types:
Log Types:MWD/LWD,CBL, RES
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2274 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 0 ft., Bottom: 2274 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17793 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2446, Top: 840 ft., Bottom: 17793 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS785 ft.
PARKMAN4302 ft.
SUSSEX4675 ft.
SHANNON5249 ft.
SHARON SPRINGS7207 ft.
NIOBRARA7226 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/13/2022                 Interval Top: 7705 ft.    Interval Bottom: 17617 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/7/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/18/2021Treatment End Date:12/31/2021
Treatment Summary:FR Water 504451 bbl, Treated Water 11933 bbl, Fresh Water 2566 bbl, 28% HCL 840 bbls (Fresh Water Total 21799554 Gals), Brine Water 87 bbls. Proppant: 100 Mesh 3674059 lbs, 200 Mesh 51200lbs, 40/70 White 16695640 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):519877Max pressure during treatment (psi):11540
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):840Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):87Total flowback volume recovered (bbls):5534
Fresh water used in treatment (bbls):518950Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20420899Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7230 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 335
BBLS_OIL 372
BTU_GAS 1311
CALC_BBLS_H2O 335
CALC_BBLS_OIL 372
CALC_GOR 911
CALC_MCF_GAS 339
CASING_PRESS 2355
GRAVITY_OIL 42
MCF_GAS 339
TUBING_PRESS 1734
Perforation Data:
Interval Top:7705 ft.# Of Holes:1584
Interval Bottom:17617 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)18119
Total Gas Produced (MCF)296346
GOR16355
GOR DeterminationMCFE
Average BOE per Day189.532
Average MCFE per Day1099.277

 Federal Financial Assurance  i 

 Tribal Well  i No