Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40330
Well Classification: OW Status: PR - 3/11/2022
Well Name/No:JOHNSON #01N-65W-30-2S
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/11/2022
FacilityID:439154LocationID:439158
Municipality/County:LOCHBUIE / WELD #123Location:SESW 30 1N65W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:230FSL  1727 FWLLat/Long: 40.015686 / -104.709983Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.015686 / -104.709983Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/31/2021
End Date: 1/9/2022
Reported: 1/24/2022
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/11/2022             Measured TD: 18308 ft.    Vertical TD: 7429 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/9/2021
Proposed Top PZ Location:Sec:30 Twp: 1N 65W Footage: 460 FSL  240 FEL
Bottom Hole Location:Sec:19 Twp: 1N 65W Footage: 1 FNL  240 FWL
Proposed Depth/Form:17902 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2305 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 980, Top: 0 ft., Bottom: 2305 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7480 ft., Depth: 11931 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/16/2021
Spud Date:5/14/2021Spud Date Is:ACTUAL
Measured TD:18308 ft.Measured PB depth:18224 ft.
True Vertical TD:7429 ft.True Vertical PB depth:7431 ft.
Top PZ Location:Sec:30 Twp: 1N 65WFootage: 490 FSL  221 FWL
Bottom Hole Location:Sec:18 Twp: 1N 65WFootage: 88 FSL  220 FWL
Log Types:
Log Types:MWD/LWD,CBL, RES run on Johnson 01N-65W-30-4H (API 05-123-40337)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2305 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 0 ft., Bottom: 2305 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17899 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 2501, Top: 676 ft., Bottom: 17899 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS788 ft.
PARKMAN4359 ft.
SUSSEX4735 ft.
SHANNON5265 ft.
SHARON SPRINGS7254 ft.
NIOBRARA7277 ft.
FORT HAYS7947 ft.
CODELL8097 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/14/2023                Interval Top: 12717 ft.    Interval Bottom: 13460 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/14/2023Treatment End Date:N/A
Treatment Summary:Perf Intervals 12717-13461, 14281-18129
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12717 ft.# Of Holes:1584
Interval Bottom:13460 ft.Hole Size:0.36 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 3/11/2022                 Interval Top: 8099 ft.    Interval Bottom: 18129 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/9/2022Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/31/2021Treatment End Date:1/9/2022
Treatment Summary:FR Water 516773 bbl, Treated Water 18261 bbl, Fresh Water 2690 bbl, 28% HCL 876 bbls (Fresh Water Total 22592871 Gals),Brine Water 201 bbls . Proppant: 100 Mesh 3733390 lbs, 40/70 White 17185157 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):538801Max pressure during treatment (psi):10690
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):876Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):201Total flowback volume recovered (bbls):2196
Fresh water used in treatment (bbls):537724Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20918547Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7531 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 161
BBLS_OIL 608
BTU_GAS 1311
CALC_BBLS_H2O 161
CALC_BBLS_OIL 608
CALC_GOR 882
CALC_MCF_GAS 536
CASING_PRESS 2048
GRAVITY_OIL 42
MCF_GAS 536
TUBING_PRESS 1717
Perforation Data:
Interval Top:8099 ft.# Of Holes:1584
Interval Bottom:18129 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/14/2023                Interval Top: 8099 ft.    Interval Bottom: 12716 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/14/2023Treatment End Date:N/A
Treatment Summary:Perf Intervals: 8099-12716, 13462-14280
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8099 ft.# Of Holes:1584
Interval Bottom:12716 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)37772
Total Gas Produced (MCF)354909
GOR9396
GOR DeterminationBOE
Average BOE per Day271.146
Average MCFE per Day1572.620

 Federal Financial Assurance  i 

 Tribal Well  i No