Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40328
Well Classification: OW Status: PR - 5/1/2024
Well Name/No:GP-Dairy #1-20-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2024
FacilityID:439134LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4673 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:658FNL  1305 FELLat/Long: 40.390050 / -104.682510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390060 / -104.682500Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/16/2015
End Date: 3/26/2015
Reported: 4/24/2015
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2024             Measured TD: 8205 ft.    Vertical TD: 6896 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/29/2016
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 1962 FSL  2420 FWL
Bottom Hole Location:Sec:20 Twp: 5N 65W Footage: 1962 FSL  2420 FWL
Proposed Depth/Form:15277 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 828, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8298 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 844, Top: 3000 ft., Bottom: 8298 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8098 ft., Depth: 15277 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/24/2015
Spud Date:1/18/2015Spud Date Is:ACTUAL
Measured TD:8205 ft.Measured PB depth:6616 ft.
True Vertical TD:6896 ft.True Vertical PB depth:5973 ft.
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 1962 FSL  2420 FWL
Bottom Hole Location:Sec:20 Twp: 5N 65WFootage: 1962 FSL  2420 FWL
Log Types:N/A
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1029 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 0 ft., Bottom: 1029 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1029 ft., Depth: 8205 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 6616 ft., Depth: , Bottom: 7216 ft., Sacks: 268, Method:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/10/2019                 Interval Top: 8135 ft.    Interval Bottom: 14935 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/28/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7090 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8135 ft.# Of Holes:1644
Interval Bottom:14935 ft.Hole Size:0.36 in.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 15000 ft.    Vertical TD: 6934 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/22/2017
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 1956 FSL  2184 FWL
Bottom Hole Location:Sec:19 Twp: 5N 65W Footage: 1980 FSL  460 FWL
Proposed Depth/Form:15277 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1029 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 445, Top: 0 ft., Bottom: 1029 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8298 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 844, Top: 0 ft., Bottom: 8298 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8098 ft., Depth: 15277 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/4/2015
Spud Date:1/18/2015Spud Date Is:ACTUAL
Measured TD:15000 ft.Measured PB depth:14996 ft.
True Vertical TD:6934 ft.True Vertical PB depth:6934 ft.
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 1982 FSL  2079 FWL
Bottom Hole Location:Sec:19 Twp: 5N 65WFootage: 1888 FSL  488 FWL
Log Types:CBL, GR, Mudlog
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1029 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 445, Top: 0 ft., Bottom: 1029 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8048 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 1038, Top: 1156 ft., Bottom: 8048 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7151 ft., Depth: 14996 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN3904 ft.
SUSSEX4699 ft.
SHANNON5243 ft.
SHARON SPRINGS7772 ft.
NIOBRARA7833 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8135 ft.    Interval Bottom: 14935 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/28/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/17/2015Treatment End Date:3/23/2015
Treatment Summary:46 Stage Plug and Perf; 103,220 bbls of fluid pumped; 9,036,680 lbs of proppant
Total fluid used in treatment (bbls):103220Max pressure during treatment (psi):9502
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.32
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):11718Total flowback volume recovered (bbls):14260
Fresh water used in treatment (bbls):91347Disposition method For flowback:RECYCLE
Total proppant used (lbs):9036680Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7090 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 464
BBLS_OIL 52
BTU_GAS 1338
CALC_BBLS_H2O 464
CALC_BBLS_OIL 52
CALC_GOR 6077
CALC_MCF_GAS 316
CASING_PRESS 3300
GRAVITY_OIL 57
MCF_GAS 316
TUBING_PRESS 2700
Perforation Data:
Interval Top:8135 ft.# Of Holes:1644
Interval Bottom:14935 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3111
Total Gas Produced (MCF)92981
GOR29887
GOR DeterminationMCFE
Average BOE per Day52.463
Average MCFE per Day304.242

 Federal Financial Assurance  i 

 Tribal Well  i No