|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/1/2018 Measured TD: 16312 ft. Vertical TD: 7187 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/1/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/24/2016 | Prop Depth/Form: | 17211 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 398, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7745 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 756, Top: 3000 ft., Bottom: 7745 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7545 ft., Depth: 17211 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 11/19/2014 | Spud Date: | 11/15/2014 | Spud Date Is: | ACTUAL | Measured TD: | 16312 ft. | Measured PB depth: | 16312 ft. | True Vertical TD: | 7187 ft. | True Vertical PB depth: | 7187 ft. | Top PZ Location: | Sec:21 Twp: 6N 67W | Footage: 2637 FSL 1321 FWL | Depth | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 2637 FSL 1321 FWL | Depth | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-40318). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 802 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 802 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7727 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 773, Top: 460 ft., Bottom: 7727 ft., Determination Method: CBL | Casing: | String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 7727 ft., Depth: 16312 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3611 ft. | | N | N | SUSSEX | 4378 ft. | | N | N | SHANNON | 4708 ft. | | N | N | SHARON SPRINGS | 7065 ft. | | N | N | NIOBRARA | 7103 ft. | | N | N | FORT HAYS | 7482 ft. | | N | N | CODELL | 7562 ft. | | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 17123 ft. Vertical TD: 7204 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 6/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/27/2016 | Prop Depth/Form: | 17160 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 0 ft., Bottom: 806 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7726 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 787, Top: 0 ft., Bottom: 7726 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7545 ft., Depth: 17160 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 942, Top: 7545 ft., Bottom: 17160 ft. |
| | |
Wellbore Completed | Completion Date: | 12/3/2014 | Spud Date: | 11/15/2014 | Spud Date Is: | ACTUAL | Measured TD: | 17123 ft. | Measured PB depth: | 17119 ft. | True Vertical TD: | 7204 ft. | True Vertical PB depth: | 7204 ft. | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 2610 FSL 590 FEL | Depth | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 2615 FSL 510 FWL | Depth | Log Types: | Mud, MWD/LWD w/ Triple Combo, (Triple Combo on 123-40318). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 802 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 802 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7727 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 773, Top: 460 ft., Bottom: 7727 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7547 ft., Depth: 17119 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: 942, Top: 7547 ft., Bottom: 17119 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3611 ft. | | N | N | SUSSEX | 4378 ft. | | N | N | SHANNON | 4708 ft. | | N | N | SHARON SPRINGS | 7065 ft. | | N | N | NIOBRARA | 7103 ft. | | N | N | FORT HAYS | 7482 ft. | | N | N | CODELL | 7562 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 7832 ft. Interval Bottom: 17062 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/22/2015 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/8/2015 | Treatment End Date: | 7/8/2015 | Treatment Summary: | Frac'd Codell with 48 stage plug and perf;
9,400,082 total lbs proppant (40/70 sand) pumped;
101643 total bbls fluid pumped: 22326 bbls recycled water, 79293 bbls fresh water, and 24 bbls 7.5% HCL acid;
Completion paused from 5/11/2015 to 7/1/2015 to fix mechanical failure on Diamond Valley East 12 well. | Total fluid used in treatment (bbls): | 101643 | Max pressure during treatment (psi): | 9012 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | 22326 | Total flowback volume recovered (bbls): | 1217 | Fresh water used in treatment (bbls): | 79293 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 9400082 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7515 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/22/2015 | Test Method: | flowing | Hours Tested: | 6 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 190 | BBLS_OIL | 30 | BTU_GAS | 1373 | CALC_BBLS_H2O | 760 | CALC_BBLS_OIL | 120 | CALC_GOR | 700 | CALC_MCF_GAS | 84 | GRAVITY_OIL | 42 | MCF_GAS | 21 | TUBING_PRESS | 1300 |
| Perforation Data: | Interval Top: | 7832 ft. | # Of Holes: | 1620 | Interval Bottom: | 17062 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 8052 |
Total Gas Produced (MCF) | 100392 |
GOR | 12467 |
GOR Determination | BOE |
Average BOE per Day | 69.281 |
Average MCFE per Day | 401.815 |
Federal Financial Assurance | i | |
|
|