Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40174
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:SUMMIT #36C-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:438869LocationID:438862
County:WELD #123Location:SESW 29 2N65W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:395FSL  1461 FWLLat/Long: 40.103319 / -104.691928Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103323 / -104.691928Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/2/2015
End Date: 4/14/2015
Reported: 6/8/2015
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 13142 ft.    Vertical TD: 7323 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/12/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 65W Footage: 64 FNL  2324 FEL
Bottom Hole Location:Sec:32 Twp: 2N 65W Footage: 12 FSL  2311 FEL
Proposed Depth/Form:13154 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 1023 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7856 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7856 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6858 ft., Depth: 13154 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/2/2015
Spud Date:10/7/2014Spud Date Is:ACTUAL
Measured TD:13142 ft.Measured PB depth:13090 ft.
True Vertical TD:7323 ft.True Vertical PB depth:7321 ft.
Top PZ Location:Sec:32 Twp: 2N 65WFootage: 64 FNL  2324 FEL
Bottom Hole Location:Sec:32 Twp: 2N 65WFootage: 12 FSL  2311 FEL
Log Types:CBL, GR, MUD, (RES in API# 05-123-40175)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1116 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 1116 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7915 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 820, Top: 35 ft., Bottom: 7915 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6839 ft., Depth: 13138 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 6839 ft., Bottom: 13138 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4591 ft.
SHARON SPRINGS7221 ft.
NIOBRARA7270 ft.
FORT HAYS7701 ft.
CODELL7797 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/20/2017                 Interval Top: 11139 ft.    Interval Bottom: 11348 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/20/2017Treatment End Date:N/A
Treatment Summary:CARLILE 11139-11348
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11139 ft.# Of Holes:408
Interval Bottom:11348 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/20/2017                 Interval Top: 10121 ft.    Interval Bottom: 13142 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/20/2017Treatment End Date:N/A
Treatment Summary:FT HAYS 10121-10210, 12909-13142
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10121 ft.# Of Holes:408
Interval Bottom:13142 ft.Hole Size:0.46 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 12/1/2022                 Interval Top: 7925 ft.    Interval Bottom: 13044 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/21/2015Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/2/2015Treatment End Date:4/14/2015
Treatment Summary:PERF AND FRAC FROM 7925-13044. 274 BBL ACID,263085 BBL SLICKWATER, 3104 BBL WATER, 266463 BBL TOTAL FLUID. 9070880# 40/70 UNIMIN CORP, 9070880# TOTAL SAND. ENTERED CODELL 7796-10121, 10210-11139, 11348-12909 FT HAYS 10121-10210, 12909-13142 CARLILE 11139-11348 SEE ATTACHMENT THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
Total fluid used in treatment (bbls):266463Max pressure during treatment (psi):7563
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):274Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):806
Fresh water used in treatment (bbls):266189Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9070880Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 242
BBLS_OIL 198
BTU_GAS 1337
CALC_BBLS_H2O 242
CALC_BBLS_OIL 198
CALC_GOR 2545
CALC_MCF_GAS 504
CASING_PRESS 1000
GRAVITY_OIL 47
MCF_GAS 504
Perforation Data:
Interval Top:7925 ft.# Of Holes:408
Interval Bottom:13044 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/20/2017                 Interval Top: 7796 ft.    Interval Bottom: 12909 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/20/2017Treatment End Date:N/A
Treatment Summary:ENTERED CODELL 7796-10121, 10210-11139, 11348-12909
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7796 ft.# Of Holes:408
Interval Bottom:12909 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2391
Total Gas Produced (MCF)88497
GOR37012
GOR DeterminationMCFE
Average BOE per Day48.382
Average MCFE per Day280.636

 Federal Financial Assurance  i 

 Tribal Well  i No