|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2022 Measured TD: 12950 ft. Vertical TD: 7326 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/12/2016 | Proposed Top PZ Location: | Sec:32 Twp: 2N 65W | Footage: 1 FNL 1200 FWL | Bottom Hole Location: | Sec:32 Twp: 2N 65W | Footage: 1 FSL 1200 FWL | Proposed Depth/Form: | 12985 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1118 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7663 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 810, Top: 0 ft., Bottom: 7663 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6663 ft., Depth: 12985 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 12/2/2014 | Spud Date: | 9/27/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12950 ft. | Measured PB depth: | 12925 ft. | True Vertical TD: | 7326 ft. | True Vertical PB depth: | 7327 ft. | Top PZ Location: | Sec:32 Twp: 2N 65W | Footage: 73 FNL 1217 FWL | Bottom Hole Location: | Sec:32 Twp: 2N 65W | Footage: 26 FSL 1207 FWL | Log Types: | CBL, GR, MUD, (RES in API# 05-123-40175) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 432, Top: 0 ft., Bottom: 1108 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7724 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 790, Top: 202 ft., Bottom: 7724 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6686 ft., Depth: 12932 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4503 ft. | | | | SHARON SPRINGS | 6980 ft. | | | | NIOBRARA | 7030 ft. | | | | FORT HAYS | 7507 ft. | | | | CODELL | 7600 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 1/13/2017 Interval Top: 8439 ft. Interval Bottom: 12950 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/13/2017 | Treatment End Date: | N/A | Treatment Summary: | CODELL 8439-10,663; 10,805-12,950 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8439 ft. | # Of Holes: | | Interval Bottom: | 12950 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: PR - 12/1/2022 Interval Top: 7774 ft. Interval Bottom: 12950 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 4/16/2015 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/19/2015 | Treatment End Date: | 4/21/2015 | Treatment Summary: | "COMPLETED THROUGH AN OPEN HOLE LINER FROM 7774-12, 950.
12 BBL ACID, 147,499 BBL SLICKWATER, - 147,511 BBL TOTAL FLUID
4,665,900# 40/70 GENOA/SAND HILLS, - 4,665,900# TOTAL SAND."
ENTERED FT. HAYS 7636-8438; 10,664-10,804
CODELL 8439-10,663; 10,805-12,950
SEE ATTACHMENT
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
| Total fluid used in treatment (bbls): | 147511 | Max pressure during treatment (psi): | 7316 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 6790 | Total flowback volume recovered (bbls): | 4235 | Fresh water used in treatment (bbls): | 140709 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4665900 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/20/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 56 | BTU_GAS | 1405 | CALC_BBLS_OIL | 56 | CALC_GOR | 1107 | CALC_MCF_GAS | 62 | CASING_PRESS | 2000 | GRAVITY_OIL | 50 | MCF_GAS | 62 |
| Perforation Data: | Interval Top: | 7774 ft. | # Of Holes: | 0 | Interval Bottom: | 12950 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 1/13/2017 Interval Top: 7636 ft. Interval Bottom: 10804 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/13/2017 | Treatment End Date: | N/A | Treatment Summary: | FT. HAYS 7636-8438; 10,664-10,804
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7636 ft. | # Of Holes: | | Interval Bottom: | 10804 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3168 |
Total Gas Produced (MCF) | 37607 |
GOR | 11870 |
GOR Determination | BOE |
Average BOE per Day | 26.485 |
Average MCFE per Day | 153.593 |
Federal Financial Assurance | i | |
|
|