Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40171
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:SUMMIT #13C-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:438866LocationID:438862
County:WELD #123Location:SWSW 29 2N65W 6
Field:WATTENBERG - #90750Elevation:4943 ft.
Planned Location:395FSL  1031 FWLLat/Long: 40.103320 / -104.693465Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103321 / -104.693466Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2015
End Date: 3/21/2015
Reported: 5/11/2015
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 12950 ft.    Vertical TD: 7326 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:9/12/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 65W Footage: 1 FNL  1200 FWL
Bottom Hole Location:Sec:32 Twp: 2N 65W Footage: 1 FSL  1200 FWL
Proposed Depth/Form:12985 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 1118 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7663 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 810, Top: 0 ft., Bottom: 7663 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6663 ft., Depth: 12985 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/2/2014
Spud Date:9/27/2014Spud Date Is:ACTUAL
Measured TD:12950 ft.Measured PB depth:12925 ft.
True Vertical TD:7326 ft.True Vertical PB depth:7327 ft.
Top PZ Location:Sec:32 Twp: 2N 65WFootage: 73 FNL  1217 FWL
Bottom Hole Location:Sec:32 Twp: 2N 65WFootage: 26 FSL  1207 FWL
Log Types:CBL, GR, MUD, (RES in API# 05-123-40175)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 0 ft., Bottom: 1108 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7724 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 202 ft., Bottom: 7724 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6686 ft., Depth: 12932 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4503 ft.
SHARON SPRINGS6980 ft.
NIOBRARA7030 ft.
FORT HAYS7507 ft.
CODELL7600 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/13/2017                 Interval Top: 8439 ft.    Interval Bottom: 12950 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:CODELL 8439-10,663; 10,805-12,950
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8439 ft.# Of Holes:
Interval Bottom:12950 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2022                 Interval Top: 7774 ft.    Interval Bottom: 12950 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/16/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2015Treatment End Date:4/21/2015
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7774-12, 950. 12 BBL ACID, 147,499 BBL SLICKWATER, - 147,511 BBL TOTAL FLUID 4,665,900# 40/70 GENOA/SAND HILLS, - 4,665,900# TOTAL SAND." ENTERED FT. HAYS 7636-8438; 10,664-10,804 CODELL 8439-10,663; 10,805-12,950 SEE ATTACHMENT THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
Total fluid used in treatment (bbls):147511Max pressure during treatment (psi):7316
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):6790Total flowback volume recovered (bbls):4235
Fresh water used in treatment (bbls):140709Disposition method For flowback:RECYCLE
Total proppant used (lbs):4665900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 56
BTU_GAS 1405
CALC_BBLS_OIL 56
CALC_GOR 1107
CALC_MCF_GAS 62
CASING_PRESS 2000
GRAVITY_OIL 50
MCF_GAS 62
Perforation Data:
Interval Top:7774 ft.# Of Holes:0
Interval Bottom:12950 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/13/2017                 Interval Top: 7636 ft.    Interval Bottom: 10804 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:FT. HAYS 7636-8438; 10,664-10,804
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7636 ft.# Of Holes:
Interval Bottom:10804 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)3168
Total Gas Produced (MCF)37607
GOR11870
GOR DeterminationBOE
Average BOE per Day26.485
Average MCFE per Day153.593

 Federal Financial Assurance  i 

 Tribal Well  i No