|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/5/2015 Measured TD: 7462 ft. Vertical TD: 7459 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/5/2015 | Wellbore Permit | | Permit #: | | Expiration Date: | 8/8/2016 | Proposed Top PZ Location: | Sec:36 Twp: 4N 66W | Footage: 714 FSL 1925 FWL | Bottom Hole Location: | Sec:36 Twp: 4N 66W | Footage: 713 FSL 1943 FWL | Proposed Depth/Form: | 7364 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 460, Top: 0 ft., Bottom: 1103 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7855 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 7855 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6684 ft., Depth: 12725 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: OPEN HOLE, Hole Size: , Size: , Top: 0 ft., Depth: 7364 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 1180, Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 11/18/2014 | Spud Date: | 11/17/2014 | Spud Date Is: | ACTUAL | Measured TD: | 7462 ft. | Measured PB depth: | 1249 ft. | True Vertical TD: | 7459 ft. | True Vertical PB depth: | 1249 ft. | Bottom Hole Location: | Sec:36 Twp: 4N 66W | Footage: 713 FSL 1943 FWL | Log Types: | MWD/LWD, FMS | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1167 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 446, Top: 0 ft., Bottom: 1167 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1167 ft., Depth: 7462 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Additional Cement: | String Type: OPEN HOLE , Top: 981 ft., Depth: , Bottom: 1466 ft., Sacks: 201, Method: | Additional Cement: | String Type: OPEN HOLE , Top: 4050 ft., Depth: , Bottom: 4662 ft., Sacks: 225, Method: | Additional Cement: | String Type: OPEN HOLE , Top: 6518 ft., Depth: , Bottom: 7462 ft., Sacks: 290, Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1053 ft. | | | | PARKMAN | 3885 ft. | | | | SUSSEX | 4310 ft. | | | | SHARON SPRINGS | 6985 ft. | | Y | | NIOBRARA | 7028 ft. | | Y | | FORT HAYS | 7295 ft. | | Y | | CODELL | 7317 ft. | | Y | | CARLILE | 7335 ft. | | Y | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 3/1/2021 Measured TD: 12672 ft. Vertical TD: 7340 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 3/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/8/2016 | Proposed Top PZ Location: | Sec:36 Twp: 4N 66W | Footage: 1 FSL 1575 FWL | Bottom Hole Location: | Sec:36 Twp: 4N 66W | Footage: 460 FSL 1575 FWL | Proposed Depth/Form: | 12703 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 460, Top: 0 ft., Bottom: 1103 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7833 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 770, Top: 0 ft., Bottom: 7933 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6689 ft., Depth: 12703 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/5/2015 | Spud Date: | 11/17/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12672 ft. | Measured PB depth: | 12672 ft. | True Vertical TD: | 7340 ft. | True Vertical PB depth: | 7340 ft. | Top PZ Location: | Sec:36 Twp: 4N 66W | Footage: 76 FSL 1564 FWL | Bottom Hole Location: | Sec:36 Twp: 4N 66W | Footage: 486 FNL 1609 FWL | Log Types: | CBL, GR, MUD, (IND in API#05-123-24063) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1167 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 446, Top: 0 ft., Bottom: 1167 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7899 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 95 ft., Bottom: 7899 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6813 ft., Depth: 12656 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4310 ft. | | | | SHARON SPRINGS | 7185 ft. | | | | NIOBRARA | 7236 ft. | | | | FORT HAYS | 7713 ft. | | | | CODELL | 7800 ft. | | | |
Formation CODL Formation Classification: GW Status: PR - 3/1/2021 Interval Top: 7931 ft. Interval Bottom: 12671 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/8/2015 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/1/2015 | Treatment End Date: | 4/2/2015 | Treatment Summary: | "COMPLETED THROUGH AN OPEN HOLE LINER FROM 7931-12,671.
87,072 BBL SLICKWATER, - 87,072 BBL TOTAL FLUID
2,624,156# 40/70 GENOA/SAND HILLS, - 2,624,156# TOTAL SAND."
| Total fluid used in treatment (bbls): | 87072 | Max pressure during treatment (psi): | 7584 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 22 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | 2820 | Total flowback volume recovered (bbls): | 2722 | Fresh water used in treatment (bbls): | 84252 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2624156 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 343 | BBLS_OIL | 33 | BTU_GAS | 1220 | CALC_BBLS_H2O | 343 | CALC_BBLS_OIL | 33 | CALC_GOR | 8182 | CALC_MCF_GAS | 270 | CASING_PRESS | 1625 | GRAVITY_OIL | 63 | MCF_GAS | 270 |
| Perforation Data: | Interval Top: | 7931 ft. | # Of Holes: | 0 | Interval Bottom: | 12671 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3221 |
Total Gas Produced (MCF) | 103097 |
GOR | 32007 |
GOR Determination | MCFE |
Average BOE per Day | 57.338 |
Average MCFE per Day | 332.568 |
Federal Financial Assurance | i | |
|
|