|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/8/2015 Measured TD: 11101 ft. Vertical TD: 6493 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/8/2015 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/20/2016 | Proposed Top PZ Location: | Sec:34 Twp: 5N 63W | Footage: 721 FSL 1 FWL | Bottom Hole Location: | Sec:34 Twp: 5N 63W | Footage: 460 FNL 1 FWL | Proposed Depth/Form: | 11095 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 410 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6866 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 2500 ft., Bottom: 6866 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6766 ft., Depth: 11095 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/4/2015 | Spud Date: | 2/22/2015 | Spud Date Is: | ACTUAL | Measured TD: | 11101 ft. | Measured PB depth: | 11050 ft. | True Vertical TD: | 6493 ft. | True Vertical PB depth: | 6493 ft. | Top PZ Location: | Sec:34 Twp: 5N 63W | Footage: 721 FSL 1 FWL | Bottom Hole Location: | Sec:34 Twp: 5N 63W | Footage: 460 FNL 1 FWL | Log Types: | CBL, Mud, MWD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 469 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 243, Top: 0 ft., Bottom: 469 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6922 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 802, Top: 362 ft., Bottom: 6922 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6719 ft., Depth: 11093 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SHARON SPRINGS | 6184 ft. | | N | N | NIOBRARA | 6335 ft. | | N | N | FORT HAYS | 6760 ft. | | | | CODELL | 7059 ft. | | | | CARLILE | 9102 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 9/22/2017 Interval Top: 9102 ft. Interval Bottom: 11005 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/22/2017 | Treatment End Date: | N/A | Treatment Summary: | 9102-9250, 9790-10116, 10538-11005 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9102 ft. | # Of Holes: | 250 | Interval Bottom: | 11005 ft. | Hole Size: | 1.36 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/22/2017 Interval Top: 7054 ft. Interval Bottom: 10537 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/22/2017 | Treatment End Date: | N/A | Treatment Summary: | 7054-9101, 9251-9789, 10117-10537 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7054 ft. | # Of Holes: | 250 | Interval Bottom: | 10537 ft. | Hole Size: | 1.36 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 5/8/2015 Interval Top: 7023 ft. Interval Bottom: 11005 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 5/1/2015 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/14/2015 | Treatment End Date: | 3/6/2015 | Treatment Summary: | 25 Stage Codel pumped a total of 59,477 bbls of fluid (Phazer) and 3,450,000 # of sand (40/70 Ottawa, 20/40 Ottawa);
ATP 4,398 psi, ATR 46.00 bpm, Final ISDP 3,334 psi; completed with sliding sleeves and casing packers.
| Total fluid used in treatment (bbls): | 59477 | Max pressure during treatment (psi): | 7381 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 25 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 15635 | Fresh water used in treatment (bbls): | 59477 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3450000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6663 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/8/2015 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 303 | BTU_GAS | 1280 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 303 | CALC_GOR | 1646 | CALC_MCF_GAS | 499 | CASING_PRESS | 994 | GRAVITY_OIL | 45 | MCF_GAS | 499 | TUBING_PRESS | 445 |
| Perforation Data: | Interval Top: | 7023 ft. | # Of Holes: | 250 | Interval Bottom: | 11005 ft. | Hole Size: | 1.36 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 9/22/2017 Interval Top: 7023 ft. Interval Bottom: 7053 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/22/2017 | Treatment End Date: | N/A | Treatment Summary: | 7023-7053 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7023 ft. | # Of Holes: | 250 | Interval Bottom: | 7053 ft. | Hole Size: | 1.36 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 824 |
Total Gas Produced (MCF) | 8554 |
GOR | 10381 |
GOR Determination | BOE |
Average BOE per Day | 6.260 |
Average MCFE per Day | 36.304 |
Federal Financial Assurance | i | |
|
|