|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 3/11/2022 Measured TD: 10011 ft. Vertical TD: 9586 ft. Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 3/11/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/9/2018 | Prop Depth/Form: | 10305 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | Not available | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ADMI , Formation: ADMIRE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: BLIN , Formation: BLAINE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: COUGR , Formation: COUNCIL GROVE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DJINJ , Formation: DENVER BASIN COMBINED DISPOSAL ZONE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DSMS , Formation: DES MOINES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LSTKA , Formation: LOWER SATANKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MSSR , Formation: MISSOURI , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: PCMB , Formation: PRECAMBRIAN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRGL , Formation: VIRGIL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 112 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 1013, Top: 0 ft., Bottom: 2500 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8441 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 449, Top: 5169 ft., Bottom: 8441 ft. | Casing: | String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5169 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 676, Top: 0 ft., Bottom: 5169 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8240 ft., Depth: 10305 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7000 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 7000 ft. |
| | |
Wellbore Completed | Completion Date: | 12/13/2017 | Spud Date: | 11/26/2017 | Spud Date Is: | ACTUAL | Measured TD: | 10011 ft. | Measured PB depth: | 10011 ft. | True Vertical TD: | 9586 ft. | True Vertical PB depth: | 9586 ft. | Top PZ Location: | Sec:26 Twp: 8N 60W | Footage: 322 FNL 873 FEL | Depth | Bottom Hole Location: | Sec:26 Twp: 8N 60W | Footage: 328 FNL 434 FEL | Depth | Log Types: | Mud Log, GR/IND/LWD, Triple Combo, MREX, CBL, Casing evaluation, NEU | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: , Top: 0 ft., Depth: 126 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2542 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 604, Top: 0 ft., Bottom: 2542 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8409 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 5198 ft., Bottom: 8409 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 8336 ft., Depth: 9999 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 0, Top: , Bottom: , Determination Method: | Casing: | String Type: STAGE TOOL, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5152 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 5168 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 3435 ft. | 6274 ft. | N | N | SHARON SPRINGS | 6274 ft. | 6378 ft. | N | N | NIOBRARA | 6378 ft. | 6618 ft. | N | N | FORT HAYS | 6618 ft. | 6672 ft. | N | N | CODELL | 6672 ft. | 6690 ft. | N | N | CARLILE | 6690 ft. | 6862 ft. | N | N | GREENHORN | 6862 ft. | 7018 ft. | N | N | X BENTONITE | 7018 ft. | 7130 ft. | N | N | D SAND | 7130 ft. | 7221 ft. | N | N | J SAND | 7221 ft. | 7354 ft. | N | N | SKULL CREEK | 7354 ft. | 7490 ft. | N | N | DAKOTA | 7490 ft. | 7579 ft. | N | N | MORRISON | 7579 ft. | 7810 ft. | N | N | ENTRADA | 7810 ft. | 7871 ft. | N | N | LYKINS | 7871 ft. | 8151 ft. | N | N | LYKINS | 7871 ft. | 8151 ft. | N | N | FORELLE | 8151 ft. | 8199 ft. | N | N | MINNEKAHTA | 8199 ft. | 8394 ft. | N | N | BLAINE | 8394 ft. | 8460 ft. | N | N | LYONS | 8460 ft. | 8585 ft. | N | N | LOWER SATANKA | 8585 ft. | 8808 ft. | N | N | WOLFCAMP | 8808 ft. | 8874 ft. | N | N | AMAZON | 8874 ft. | 8936 ft. | N | N | COUNCIL GROVE | 8936 ft. | 9132 ft. | N | N | ADMIRE | 9132 ft. | 9184 ft. | N | N | VIRGIL | 9184 ft. | 9378 ft. | N | N | MISSOURI | 9378 ft. | 9522 ft. | N | N | DES MOINES | 9522 ft. | 9734 ft. | N | N | ATOKA | 9734 ft. | 10011 ft. | N | N |
Formation ATOK Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 9734 ft. Interval Bottom: 10011 ft. Completed Information for Formation ATOKA | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | ATOKA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ATOK. |
| Perforation Data: | Interval Top: | 9734 ft. | # Of Holes: | | Interval Bottom: | 10011 ft. | Hole Size: | |
|
Formation DSMS Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 9522 ft. Interval Bottom: 9734 ft. Completed Information for Formation DES MOINES | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | DES MOINES | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSMS. |
| Perforation Data: | Interval Top: | 9522 ft. | # Of Holes: | | Interval Bottom: | 9734 ft. | Hole Size: | |
|
Formation MSSR Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 9378 ft. Interval Bottom: 9522 ft. Completed Information for Formation MISSOURI | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | MISSOURI | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSR. |
| Perforation Data: | Interval Top: | 9378 ft. | # Of Holes: | | Interval Bottom: | 9522 ft. | Hole Size: | |
|
Formation VRGL Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 9184 ft. Interval Bottom: 9378 ft. Completed Information for Formation VIRGIL | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | VIRGIL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRGL. |
| Perforation Data: | Interval Top: | 9184 ft. | # Of Holes: | | Interval Bottom: | 9378 ft. | Hole Size: | |
|
Formation ADMI Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 9132 ft. Interval Bottom: 9184 ft. Completed Information for Formation ADMIRE | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | ADMIRE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/22/2018 | Treatment End Date: | N/A | Treatment Summary: | 401495929 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ADMI. |
| Perforation Data: | Interval Top: | 9132 ft. | # Of Holes: | | Interval Bottom: | 9184 ft. | Hole Size: | |
|
Formation COUGR Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8936 ft. Interval Bottom: 9132 ft. Completed Information for Formation COUNCIL GROVE | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | COUNCIL GROVE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation COUGR. |
| Perforation Data: | Interval Top: | 8936 ft. | # Of Holes: | | Interval Bottom: | 9132 ft. | Hole Size: | |
|
Formation AMZN Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8874 ft. Interval Bottom: 8936 ft. Completed Information for Formation AMAZON | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | AMAZON | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation AMZN. |
| Perforation Data: | Interval Top: | 8874 ft. | # Of Holes: | | Interval Bottom: | 8936 ft. | Hole Size: | |
|
Formation WFCMP Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8808 ft. Interval Bottom: 8874 ft. Completed Information for Formation WOLFCAMP | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | WOLFCAMP | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCMP. |
| Perforation Data: | Interval Top: | 8808 ft. | # Of Holes: | | Interval Bottom: | 8874 ft. | Hole Size: | |
|
Formation LSTKA Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8585 ft. Interval Bottom: 8808 ft. Completed Information for Formation LOWER SATANKA | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | LOWER SATANKA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LSTKA. |
| Perforation Data: | Interval Top: | 8585 ft. | # Of Holes: | | Interval Bottom: | 8808 ft. | Hole Size: | |
|
Formation LYNS Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8460 ft. Interval Bottom: 8585 ft. Completed Information for Formation LYONS | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | LYONS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LYNS. |
| Perforation Data: | Interval Top: | 8460 ft. | # Of Holes: | | Interval Bottom: | 8585 ft. | Hole Size: | |
|
Formation BLIN Formation Classification: DSPW Status: CM - 2/9/2018 Interval Top: 8409 ft. Interval Bottom: 8460 ft. Completed Information for Formation BLAINE | 1st Production Date: | 2/9/2018 | Choke Size: | | Formation Name: | BLAINE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8336 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation BLIN. |
| Perforation Data: | Interval Top: | 8409 ft. | # Of Holes: | | Interval Bottom: | 8460 ft. | Hole Size: | |
|
Formation DJINJ Formation Classification: DSPW Status: IJ - 3/11/2022 Interval Top: 8409 ft. Interval Bottom: 10011 ft. Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 6/9/2021 | Treatment End Date: | 6/9/2021 | Treatment Summary: | Bullhead acid stimulation with 10,000 gal of 15% HCl, 1,000 gal of Xylene, and 9,600lbs of rock salt as a diverter. Filtered produced water used for displacement. | Total fluid used in treatment (bbls): | 605 | Max pressure during treatment (psi): | 942 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 239 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 342 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 9/4/2019 | Treatment End Date: | 9/4/2019 | Treatment Summary: | 9,257 gal of 15% HCl, 1,000 gal of Paragon (a xylene substitute), and 2,000 lbs of rock salt. 70 bbl of 3% KCl used to carry and displace the rock salt. | Total fluid used in treatment (bbls): | 450 | Max pressure during treatment (psi): | 1137 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 220 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 160 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | | Treatment Date: | 1/22/2018 | Treatment End Date: | N/A | Treatment Summary: | Slotted liner: 4 1/2", 11.6 kb/ft, N-80, LTC. (TOL @ 8,336'MD; EOL @ 9,99'MD in 6 1/8" Open Hole). Slots: Beginning at 8425'MD, 24 R x 2" 0.08" on 6" Center. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 8386 ft. | Tubing Packer Depth: | 8336 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DJINJ. |
| Perforation Data: | Interval Top: | 8409 ft. | # Of Holes: | | Interval Bottom: | 10011 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|