|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2021 Measured TD: 11601 ft. Vertical TD: 7015 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/5/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 7N 64W | Footage: 465 FNL 1493 FEL | | Bottom Hole Location: | Sec:28 Twp: 7N 64W | Footage: 465 FSL 1522 FEL | | Proposed Depth/Form: | 11592 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 333, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7248 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 620, Top: 400 ft., Bottom: 7248 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6948 ft., Depth: 11592 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/27/2014 | | Spud Date: | 10/27/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11601 ft. | Measured PB depth: | 11586 ft. | | True Vertical TD: | 7015 ft. | True Vertical PB depth: | 7016 ft. | | Top PZ Location: | Sec:28 Twp: 7N 64W | Footage: 516 FNL 1504 FEL | | Bottom Hole Location: | Sec:28 Twp: 7N 64W | Footage: 467 FSL 1504 FEL | | Log Types: | MWD, Mud, CBL, O.H. Logging Exception for API#05-123-39835 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 788 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 788 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7278 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 218 ft., Bottom: 7278 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6589 ft., Depth: 11601 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 6589 ft., Bottom: 11601 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3901 ft. | | N | N | | SUSSEX | 4578 ft. | 5240 ft. | N | N | | SHARON SPRINGS | 6857 ft. | | N | N | | NIOBRARA | 6936 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2021 Interval Top: 7300 ft. Interval Bottom: 11567 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/14/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/10/2015 | Treatment End Date: | 3/21/2015 | | Treatment Summary: | Frac 20 stages (plug & perf) with 101,279 bbls slickwater & XL gel and 3,814,902 lbs 30/50 sand | | Total fluid used in treatment (bbls): | 101779 | Max pressure during treatment (psi): | 7988 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 500 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7502 | | Fresh water used in treatment (bbls): | 101279 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3814902 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6910 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/24/2015 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 326 | | BBLS_OIL | 186 | | BTU_GAS | 1324 | | CALC_BBLS_H2O | 326 | | CALC_BBLS_OIL | 186 | | CALC_GOR | 688 | | CALC_MCF_GAS | 128 | | CASING_PRESS | 900 | | GRAVITY_OIL | 44 | | MCF_GAS | 128 |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 613 | | Interval Bottom: | 11567 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2222 |
| Total Gas Produced (MCF) | 19427 |
| GOR | 8743 |
| GOR Determination | BOE |
| Average BOE per Day | 15.298 |
| Average MCFE per Day | 88.718 |
| Federal Financial Assurance | i | |
|
|