|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 17672 ft. Vertical TD: 7744 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/15/2018 | | Proposed Top PZ Location: | Sec:10 Twp: 1N 67W | Footage: 954 FSL 1710 FWL | | Bottom Hole Location: | Sec:3 Twp: 1N 67W | Footage: 50 FNL 1722 FWL | | Proposed Depth/Form: | 17747 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8105 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 910, Top: 0 ft., Bottom: 8105 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7004 ft., Depth: 17747 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: , Bottom: 17747 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/13/2017 | | Spud Date: | 12/21/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 17672 ft. | Measured PB depth: | 17568 ft. | | True Vertical TD: | 7744 ft. | True Vertical PB depth: | 7744 ft. | | Top PZ Location: | Sec:10 Twp: 1N 67W | Footage: 1082 FSL 1685 FWL | | Bottom Hole Location: | Sec:3 Twp: 1N 67W | Footage: 89 FNL 1692 FWL | | Log Types: | CBL, MWD/GR, (RESISTIVITY in 05-123-39789) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.1 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2252 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 851, Top: 0 ft., Bottom: 2252 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17662 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2420, Top: 348 ft., Bottom: 17662 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4639 ft. | | | | | SHARON SPRINGS | 7437 ft. | | | | | NIOBRARA | 7500 ft. | | | | | FORT HAYS | 7961 ft. | | | | | CODELL | 8209 ft. | | | | | CARLILE | 14547 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 10/12/2017 Interval Top: 14553 ft. Interval Bottom: 16732 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2017 | Treatment End Date: | N/A | | Treatment Summary: | CARLILE: 14,553-14,830; 15,861-16,732;" | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 14553 ft. | # Of Holes: | 573 | | Interval Bottom: | 16732 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/12/2017 Interval Top: 8208 ft. Interval Bottom: 17458 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2017 | Treatment End Date: | N/A | | Treatment Summary: | CODELL: 8208-8254; 8279-11,251; 11,388-14,553; 14,830-14,896; 15,150-15,776; 16,732-17,458;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8208 ft. | # Of Holes: | 573 | | Interval Bottom: | 17458 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 8200 ft. Interval Bottom: 17458 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 9/10/2017 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/28/2017 | Treatment End Date: | 8/3/2017 | | Treatment Summary: | "PERF AND FRAC FROM 8200-17,458.
100 BBL 7.5% HCL ACID, 8,555 BBL PUMP DOWN, 169,755 BBL SLICKWATER, - 178,410 TOTAL FLUID
1,040,276# 100 MESH OTTAWA/ST. PETERS, 4,050,133# 40/70 OTTAWA/ST. PETERS, - 5,090,408# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 178410 | Max pressure during treatment (psi): | 7839 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | 100 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 21476 | Total flowback volume recovered (bbls): | 9801 | | Fresh water used in treatment (bbls): | 156834 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5090408 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/20/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 760 | | BBLS_OIL | 197 | | BTU_GAS | 1322 | | CALC_BBLS_H2O | 760 | | CALC_BBLS_OIL | 197 | | CALC_GOR | 1858 | | CALC_MCF_GAS | 366 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 53 | | MCF_GAS | 366 |
| | Perforation Data: | | Interval Top: | 8200 ft. | # Of Holes: | 573 | | Interval Bottom: | 17458 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 10/12/2017 Interval Top: 8200 ft. Interval Bottom: 15861 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2017 | Treatment End Date: | N/A | | Treatment Summary: | FORT HAYS: 8200-8208; 8254-8279; 11,251-11,388; 14,896-15,150; 15,776-15,861;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8200 ft. | # Of Holes: | 573 | | Interval Bottom: | 15861 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 539 |
| Total Gas Produced (MCF) | 18152 |
| GOR | 33677 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.047 |
| Average MCFE per Day | 58.254 |
| Federal Financial Assurance | i | |
|
|