|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2021 Measured TD: 17485 ft. Vertical TD: 7731 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/19/2018 | | Proposed Top PZ Location: | Sec:10 Twp: 1N 67W | Footage: 957 FSL 1850 FEL | | Bottom Hole Location: | Sec:3 Twp: 1N 67W | Footage: 80 FNL 1792 FEL | | Proposed Depth/Form: | 17719 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 680, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8107 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 910, Top: 0 ft., Bottom: 8107 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 7009 ft., Depth: 17719 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 700, Top: , Bottom: 17719 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7037 ft., Depth: 17757 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/9/2016 | | Spud Date: | 10/14/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 17485 ft. | Measured PB depth: | 17426 ft. | | True Vertical TD: | 7731 ft. | True Vertical PB depth: | 7731 ft. | | Top PZ Location: | Sec:10 Twp: 1N 67W | Footage: 1000 FSL 1880 FEL | | Bottom Hole Location: | Sec:3 Twp: 1N 67W | Footage: 261 FNL 1837 FEL | | Log Types: | CBL, MWD, (RESISTIVITY in 123-39785) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2276 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 849, Top: 0 ft., Bottom: 2276 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17475 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2525, Top: 56 ft., Bottom: 17475 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4654 ft. | | | | | SHARON SPRINGS | 7434 ft. | | | | | NIOBRARA | 7493 ft. | | | | | FORT HAYS | 7961 ft. | | | | | CODELL | 8033 ft. | | | | | CARLILE | 15022 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/17/2017 Interval Top: 15022 ft. Interval Bottom: 15556 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/17/2017 | Treatment End Date: | N/A | | Treatment Summary: | CARLILE: 15,022-15,274; 15,489-15,556;" | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 15022 ft. | # Of Holes: | 525 | | Interval Bottom: | 15556 ft. | Hole Size: | 0.46 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/17/2017 Interval Top: 8381 ft. Interval Bottom: 14458 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/17/2017 | Treatment End Date: | N/A | | Treatment Summary: | FT HAYS: 8381-8646; 13,297-13,736; 14,340-14,458;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8381 ft. | # Of Holes: | 525 | | Interval Bottom: | 14458 ft. | Hole Size: | 0.46 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 2/1/2021 Interval Top: 8096 ft. Interval Bottom: 17301 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 8/9/2017 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/7/2017 | Treatment End Date: | 7/15/2017 | | Treatment Summary: | "PERF AND FRAC FROM 8096-17,301.
364 BBL 7.5% HCL ACID, 7,843 BBL BIO WATER, 167,784 BBL SLICKWATER, - 175,990 TOTAL FLUID
4,983,230# 40/70 OTTAWA/ST. PETERS, - 4,983,230# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 175990 | Max pressure during treatment (psi): | 7847 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | 364 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 11106 | Total flowback volume recovered (bbls): | 5231 | | Fresh water used in treatment (bbls): | 164520 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 4983230 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/22/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 197 | | BBLS_OIL | 19 | | BTU_GAS | 1322 | | CALC_BBLS_H2O | 197 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4842 | | CALC_MCF_GAS | 92 | | CASING_PRESS | 1125 | | GRAVITY_OIL | 53 | | MCF_GAS | 92 |
| | Perforation Data: | | Interval Top: | 8096 ft. | # Of Holes: | 525 | | Interval Bottom: | 17301 ft. | Hole Size: | 0.46 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/17/2017 Interval Top: 8096 ft. Interval Bottom: 17301 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/17/2017 | Treatment End Date: | N/A | | Treatment Summary: | CODELL: 8096-8381; 8646-13,297; 13,736-14,340; 14,458-15,022; 15,274-15,489; 15,556-17,301;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8096 ft. | # Of Holes: | 525 | | Interval Bottom: | 17301 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3635 |
| Total Gas Produced (MCF) | 75345 |
| GOR | 20727 |
| GOR Determination | MCFE |
| Average BOE per Day | 45.711 |
| Average MCFE per Day | 265.153 |
| Federal Financial Assurance | i | |
|
|