Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39778
Well Classification: OW Status: PR - 6/4/2015
Well Name/No:Newnam #2F-32H C264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2015
FacilityID:437929LocationID:437930
County:WELD #123Location:NENW 32 2N64W 6
Field:WATTENBERG - #90750Elevation:4967 ft.
Planned Location:308FNL  1597 FWLLat/Long: 40.101467 / -104.578530Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101467 / -104.578530Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2015
End Date: 4/4/2015
Reported: 5/11/2015
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/4/2015             Measured TD: 11632 ft.    Vertical TD: 7138 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/4/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/1/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 64W Footage: 611 FNL  1096 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64W Footage: 460 FSL  1150 FWL
Proposed Depth/Form:11783 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7534 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 921, Top: 500 ft., Bottom: 7534 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11783 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 375, Top: 7234 ft., Bottom: 11783 ft.

Wellbore Completed
Completion Date:12/18/2014
Spud Date:12/8/2014Spud Date Is:ACTUAL
Measured TD:11632 ft.Measured PB depth:11613 ft.
True Vertical TD:7138 ft.True Vertical PB depth:7138 ft.
Top PZ Location:Sec:32 Twp: 2N 64WFootage: 692 FNL  1093 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64WFootage: 529 S  1134 W
Log Types:CBL/MWD/(NEU, DENS run in API: 123-21516)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 137 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 137 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1026 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 422, Top: 0 ft., Bottom: 1040 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7529 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 666, Top: 995 ft., Bottom: 7544 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11617 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 401, Top: 5612 ft., Bottom: 11632 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6906 ft.
NIOBRARA6916 ft.
FORT HAYS7385 ft.
CODELL7544 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/3/2018                  Interval Top: 9806 ft.    Interval Bottom: 11564 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2015Treatment End Date:4/2/2015
Treatment Summary:Stages 1 - 4 & 9 - 13 treated with 13,877 bbls of fresh water, 43 bbls of recycled water, 116 bbls of additives, 36 bbls of acid 15%, and 871,546 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):14071Max pressure during treatment (psi):8182
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):43Total flowback volume recovered (bbls):43
Fresh water used in treatment (bbls):13992Disposition method For flowback:DISPOSAL
Total proppant used (lbs):871546Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9806 ft.# Of Holes:252
Interval Bottom:11564 ft.Hole Size:0.375 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/3/2018                  Interval Top: 8298 ft.    Interval Bottom: 11114 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/27/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2015Treatment End Date:4/3/2015
Treatment Summary:Stages 5 - 8, & 20 - 23 treated with 12,508 of fresh water, 39 bbls of recycled water, 103 bbls of additives, 32 bbls of acid 15%, and 774,707 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):12508Max pressure during treatment (psi):9100
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):32Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):39Total flowback volume recovered (bbls):39
Fresh water used in treatment (bbls):12438Disposition method For flowback:DISPOSAL
Total proppant used (lbs):774707Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8298 ft.# Of Holes:252
Interval Bottom:11114 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/3/2018                  Interval Top: 7547 ft.    Interval Bottom: 9758 ft.

 Completed Information for Formation CODELL
1st Production Date:5/27/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/2/2015Treatment End Date:4/4/2015
Treatment Summary:Stages 14 - 19, & 24 - 28 treated with 15,635 of fresh water, 48 bbls of recycled water, 129 bbls of additives, 40 bbls of acid 15%, and 968,384 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):15635Max pressure during treatment (psi):8251
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):40Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):48Total flowback volume recovered (bbls):48
Fresh water used in treatment (bbls):15547Disposition method For flowback:DISPOSAL
Total proppant used (lbs):968384Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7547 ft.# Of Holes:351
Interval Bottom:9758 ft.Hole Size:0.375 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 6/4/2015                  Interval Top: 7547 ft.    Interval Bottom: 11564 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2015Treatment End Date:4/4/2015
Treatment Summary:Stages 1 - 28 treated with 41,630 bbls of fresh water, 130 bbls of recycled water, 347 bbls of additives, 107 bbls of acid 15%, and 2,614,637 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):42214Max pressure during treatment (psi):9100
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):130Total flowback volume recovered (bbls):130
Fresh water used in treatment (bbls):41977Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2614637Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7212 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2015Test Method:FLOWS FROM WELL
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 207
BBLS_OIL 91
BTU_GAS 1298
CALC_BBLS_H2O 207
CALC_BBLS_OIL 91
CALC_GOR 2560
CALC_MCF_GAS 233
CASING_PRESS 1947
GRAVITY_OIL 50
MCF_GAS 233
TUBING_PRESS 1052
Perforation Data:
Interval Top:7547 ft.# Of Holes:855
Interval Bottom:11564 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2151
Total Gas Produced (MCF)10538
GOR4899
GOR DeterminationBOE
Average BOE per Day10.849
Average MCFE per Day62.906

 Federal Financial Assurance  i 

 Tribal Well  i No