Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39772
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Newnam #2H-32H C264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BISON IV OPERATING LLC - 10670
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:437923LocationID:437930
County:WELD #123Location:NENW 32 2N64W 6
Field:WATTENBERG - #90750Elevation:4967 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:308FNL  1617 FWLLat/Long: 40.101466 / -104.578458Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101466 / -104.578458Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/1/2015
End Date: 4/5/2015
Reported: 5/11/2015
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 11332 ft.    Vertical TD: 6948 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/1/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 64W Footage: 611 FNL  1545 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64W Footage: 460 FSL  1600 FWL
Proposed Depth/Form:11540 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7289 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 889, Top: 500 ft., Bottom: 7289 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11539 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 375, Top: 6989 ft., Bottom: 11539 ft.

Wellbore Completed
Completion Date:1/8/2015
Spud Date:12/29/2014Spud Date Is:ACTUAL
Measured TD:11332 ft.Measured PB depth:11313 ft.
True Vertical TD:6948 ft.True Vertical PB depth:6948 ft.
Top PZ Location:Sec:32 Twp: 2N 64WFootage: 857 FNL  1553 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64WFootage: 551 FSL  1584 FWL
Log Types:CBL/MWD/GR/(NEU, DENS run in API: 123-21516)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 137 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 137 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1055 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 426, Top: 0 ft., Bottom: 1070 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7416 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 647, Top: 0 ft., Bottom: 7431 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11317 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 5372 ft., Bottom: 11332 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6928 ft.
NIOBRARA6984 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7442 ft.    Interval Bottom: 11265 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/1/2015Treatment End Date:4/5/2015
Treatment Summary:Stages 1 - 26 treated with 74,485 bbls of fresh water, 1,085 bbls of recycled water, 382 bbls of additives, 631 bbls of acid 15%, and 4,827,407 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):76583Max pressure during treatment (psi):8780
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):631Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):1085Total flowback volume recovered (bbls):1085
Fresh water used in treatment (bbls):74867Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4827407Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6969 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2015Test Method:flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 340
BBLS_OIL 150
BTU_GAS 1298
CALC_BBLS_H2O 340
CALC_BBLS_OIL 150
CALC_GOR 887
CALC_MCF_GAS 133
CASING_PRESS 1670
GRAVITY_OIL 50
MCF_GAS 133
TUBING_PRESS 1176
Perforation Data:
Interval Top:7442 ft.# Of Holes:675
Interval Bottom:11265 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8
GOR
GOR DeterminationMCFE
Average BOE per Day0.005
Average MCFE per Day0.022

 Federal Financial Assurance  i 

 Tribal Well  i No