|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 3/11/2022 Measured TD: 9900 ft. Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 3/11/2022 | Wellbore Permit | | Permit #: | | Expiration Date: | 7/1/2016 | Prop Depth/Form: | 9907 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | Not available | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ADMI , Formation: ADMIRE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: AMZN , Formation: AMAZON , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: COUGR , Formation: COUNCIL GROVE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: DSMS , Formation: DES MOINES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LSTKA , Formation: LOWER SATANKA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: PCMB , Formation: PRECAMBRIAN , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRGL , Formation: VIRGIL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 650 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 340, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8115 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 220, Top: 6660 ft., Bottom: 8115 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7915 ft., Depth: 9904 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6660 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 1050, Top: 0 ft., Bottom: 6660 ft. |
| | |
Wellbore Completed | Completion Date: | 8/27/2014 | Spud Date: | 8/13/2014 | Spud Date Is: | ACTUAL | Measured TD: | 9900 ft. | Measured PB depth: | 9893 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Induction, MUD, Microlog, Density/Neutron, CBL, Triple Combo - Longstring | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 696 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 219, Top: 0 ft., Bottom: 696 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8079 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 6712 ft., Bottom: 8079 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7959 ft., Depth: 9900 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Additional Cement: | String Type: STAGE TOOL, Top: 1566 ft., Depth: 6712 ft., Bottom: 6712 ft., Sacks: 894, Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | LYONS | 8087 ft. | 8210 ft. | N | N | LOWER SATANKA | 8210 ft. | 8430 ft. | N | N | WOLFCAMP | 8430 ft. | 8499 ft. | N | N | AMAZON | 8499 ft. | 8568 ft. | N | N | COUNCIL GROVE | 8568 ft. | 8740 ft. | N | N | ADMIRE | 8740 ft. | 8790 ft. | N | N | VIRGIL | 8790 ft. | 8989 ft. | N | N | MISSOURI | 8989 ft. | 9134 ft. | N | N | DES MOINES | 9134 ft. | 9335 ft. | N | N | ATOKA | 9335 ft. | 9767 ft. | N | N | MORROW | 9767 ft. | 9853 ft. | N | N | MISSISSIPPIAN | 9853 ft. | 9882 ft. | N | N | REAGAN | 9882 ft. | 9900 ft. | N | N |
Formation REGN Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 9882 ft. Interval Bottom: 9893 ft. Completed Information for Formation REAGAN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | REAGAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation REGN. |
| Perforation Data: | Interval Top: | 9882 ft. | # Of Holes: | | Interval Bottom: | 9893 ft. | Hole Size: | |
|
Formation MSSP Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 9853 ft. Interval Bottom: 9882 ft. Completed Information for Formation MISSISSIPPIAN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MISSISSIPPIAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSP. |
| Perforation Data: | Interval Top: | 9853 ft. | # Of Holes: | | Interval Bottom: | 9882 ft. | Hole Size: | |
|
Formation MRRW Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 9767 ft. Interval Bottom: 9853 ft. Completed Information for Formation MORROW | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MORROW | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MRRW. |
| Perforation Data: | Interval Top: | 9767 ft. | # Of Holes: | | Interval Bottom: | 9853 ft. | Hole Size: | |
|
Formation ATOK Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 9335 ft. Interval Bottom: 9767 ft. Completed Information for Formation ATOKA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | ATOKA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ATOK. |
| Perforation Data: | Interval Top: | 9335 ft. | # Of Holes: | | Interval Bottom: | 9767 ft. | Hole Size: | |
|
Formation DSMS Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 9134 ft. Interval Bottom: 9335 ft. Completed Information for Formation DES MOINES | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DES MOINES | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSMS. |
| Perforation Data: | Interval Top: | 9134 ft. | # Of Holes: | | Interval Bottom: | 9335 ft. | Hole Size: | |
|
Formation MSSR Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8989 ft. Interval Bottom: 9134 ft. Completed Information for Formation MISSOURI | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MISSOURI | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MSSR. |
| Perforation Data: | Interval Top: | 8989 ft. | # Of Holes: | | Interval Bottom: | 9134 ft. | Hole Size: | |
|
Formation VRGL Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8790 ft. Interval Bottom: 8989 ft. Completed Information for Formation VIRGIL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VIRGIL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation VRGL. |
| Perforation Data: | Interval Top: | 8790 ft. | # Of Holes: | | Interval Bottom: | 8989 ft. | Hole Size: | |
|
Formation ADMI Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8740 ft. Interval Bottom: 8790 ft. Completed Information for Formation ADMIRE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | ADMIRE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation ADMI. |
| Perforation Data: | Interval Top: | 8740 ft. | # Of Holes: | | Interval Bottom: | 8790 ft. | Hole Size: | |
|
Formation COUGR Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8568 ft. Interval Bottom: 8740 ft. Completed Information for Formation COUNCIL GROVE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | COUNCIL GROVE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation COUGR. |
| Perforation Data: | Interval Top: | 8568 ft. | # Of Holes: | | Interval Bottom: | 8740 ft. | Hole Size: | |
|
Formation AMZN Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8499 ft. Interval Bottom: 8568 ft. Completed Information for Formation AMAZON | 1st Production Date: | N/A | Choke Size: | | Formation Name: | AMAZON | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation AMZN. |
| Perforation Data: | Interval Top: | 8499 ft. | # Of Holes: | | Interval Bottom: | 8568 ft. | Hole Size: | |
|
Formation WFCMP Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8430 ft. Interval Bottom: 8499 ft. Completed Information for Formation WOLFCAMP | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WOLFCAMP | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCMP. |
| Perforation Data: | Interval Top: | 8430 ft. | # Of Holes: | | Interval Bottom: | 8499 ft. | Hole Size: | |
|
Formation LSTKA Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8210 ft. Interval Bottom: 8430 ft. Completed Information for Formation LOWER SATANKA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LOWER SATANKA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LSTKA. |
| Perforation Data: | Interval Top: | 8210 ft. | # Of Holes: | | Interval Bottom: | 8430 ft. | Hole Size: | |
|
Formation LYNS Formation Classification: DSPW Status: CM - 11/9/2014 Interval Top: 8087 ft. Interval Bottom: 8210 ft. Completed Information for Formation LYONS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LYONS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation LYNS. |
| Perforation Data: | Interval Top: | 8087 ft. | # Of Holes: | | Interval Bottom: | 8210 ft. | Hole Size: | |
|
Formation DJINJ Formation Classification: DSPW Status: IJ - 3/11/2022 Interval Top: 8079 ft. Interval Bottom: 9893 ft. Completed Information for Formation DENVER BASIN COMBINED DISPOSAL ZONE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DENVER BASIN COMBINED DISPOSAL ZONE | Commingled: | | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 6/8/2021 | Treatment End Date: | 6/8/2021 | Treatment Summary: | Bullhead acid job with 10,000 gal of 15% HCl, 1,000 gal of xylene, and 9,600 lbs of rock salt as a diverter. Filtered produced water used for displacement. | Total fluid used in treatment (bbls): | 439 | Max pressure during treatment (psi): | 1309 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 238 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 177 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 9/4/2019 | Treatment End Date: | 9/4/2019 | Treatment Summary: | 7,757 gal of 15% HCl, 1,000 gal of Paragon (a Xylene substitute), and 2,000 lbs of rock salt. | Total fluid used in treatment (bbls): | 455 | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 185 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 160 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 10/8/2014 | Treatment End Date: | 10/8/2014 | Treatment Summary: | Open hole completion. Acid treatment over entire interval. | Total fluid used in treatment (bbls): | 2658 | Max pressure during treatment (psi): | 1764 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 120 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | 2538 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 7910 ft. | Tubing Packer Depth: | 7910 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DJINJ. |
| Perforation Data: | Interval Top: | 8079 ft. | # Of Holes: | | Interval Bottom: | 9893 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|