Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39767
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:Atwater State #LD01-77-1BHN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:437905LocationID:437902
County:WELD #123Location:SESW 1 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4672 ft.
Planned Location:400FSL  1412 FWLLat/Long: 40.774400 / -103.816550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.774400 / -103.816550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2015
End Date: 4/8/2015
Reported: 6/23/2015
Originally Reported: 6/3/2015
Days to report: 76
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 14598 ft.    Vertical TD: 5522 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/29/2016
Proposed Top PZ Location:Sec:1 Twp: 9N 58W Footage: 1103 FSL  1764 FWL
Bottom Hole Location:Sec:36 Twp: 10N 58W Footage: 810 FNL  1760 FWL
Proposed Depth/Form:14539 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 535-451 , Unit Acreage: 3200, Drill Unit: S.1,2,11,12;S.36:All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5828 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 400, Top: , Bottom: 5828 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5678 ft., Depth: 14539 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/20/2014
Spud Date:11/10/2014Spud Date Is:ACTUAL
Measured TD:14598 ft.Measured PB depth:14598 ft.
True Vertical TD:5522 ft.True Vertical PB depth:5522 ft.
Top PZ Location:Sec:1 Twp: 9N 58WFootage: 1227 FSL  1728 FWL
Bottom Hole Location:Sec:36 Twp: 10N 58WFootage: 810 FNL  1755 FWL
Log Types:CBL/Mud/Gamma, (DIL in 123-39766)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.9 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1249 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 1249 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5902 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 428, Top: 1240 ft., Bottom: 5902 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5744 ft., Depth: 14583 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2275 ft.
PARKMAN3163 ft.
SUSSEX3749 ft.
SHANNON4197 ft.
NIOBRARA5578 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 9/1/2024                  Interval Top: 6032 ft.    Interval Bottom: 14519 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/16/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/30/2015Treatment End Date:4/8/2015
Treatment Summary:Frac'd the Niobrara w/ 9957227 gals of Silverstim and Slick Water with 6482489#'s of Ottawa sand.
Total fluid used in treatment (bbls):237076Max pressure during treatment (psi):7402
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):87156Total flowback volume recovered (bbls):768
Fresh water used in treatment (bbls):149920Disposition method For flowback:RECYCLE
Total proppant used (lbs):6482489Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 592
BBLS_OIL 630
BTU_GAS 1264
CALC_BBLS_H2O 592
CALC_BBLS_OIL 630
CALC_GOR 292
CALC_MCF_GAS 184
CASING_PRESS 953
GRAVITY_OIL 40
MCF_GAS 184
TUBING_PRESS 324
Perforation Data:
Interval Top:6032 ft.# Of Holes:0
Interval Bottom:14519 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)1898
Total Gas Produced (MCF)5428
GOR2859
GOR DeterminationBOE
Average BOE per Day7.678
Average MCFE per Day44.530

 Federal Financial Assurance  i 

 Tribal Well  i No