|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2025 Measured TD: 10320 ft. Vertical TD: 5442 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/29/2016 | | Proposed Top PZ Location: | Sec:12 Twp: 9N 58W | Footage: 427 FNL 1315 FWL | | Bottom Hole Location: | Sec:12 Twp: 9N 58W | Footage: 330 FSL 1320 FWL | | Proposed Depth/Form: | 10375 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 535-451 , Unit Acreage: 3200, Drill Unit: S.1,2,11,12;S.36:All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5881 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: , Bottom: 5881 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5657 ft., Depth: 10375 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/10/2014 | | Spud Date: | 12/4/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 10320 ft. | Measured PB depth: | 10313 ft. | | True Vertical TD: | 5442 ft. | True Vertical PB depth: | 5442 ft. | | Top PZ Location: | Sec:12 Twp: 9N 58W | Footage: 363 FNL 1359 FWL | | Bottom Hole Location: | Sec:12 Twp: 9N 58W | Footage: 389 FSL 1334 FWL | | Log Types: | CBL/Mud/Gamma. (DIL in 123-39766) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.05 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1252 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 477, Top: 0 ft., Bottom: 1252 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5813 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 418, Top: 1180 ft., Bottom: 5813 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5653 ft., Depth: 10315 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2271 ft. | | | | | PARKMAN | 3143 ft. | | | | | SUSSEX | 3731 ft. | | | | | SHANNON | 4165 ft. | | | | | NIOBRARA | 5654 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 12/1/2025 Interval Top: 5942 ft. Interval Bottom: 10247 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/27/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/27/2015 | Treatment End Date: | 3/5/2015 | | Treatment Summary: | Frac'd the Niobrara w/ 4256687 gals of Nolte-Smith Calc and 3045620#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 101349 | Max pressure during treatment (psi): | 6348 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 23 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 105 | | Fresh water used in treatment (bbls): | 101349 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3045620 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5666 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/2/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 124 | | BBLS_OIL | 574 | | BTU_GAS | 2768 | | CALC_BBLS_H2O | 124 | | CALC_BBLS_OIL | 574 | | CALC_GOR | 216 | | CALC_MCF_GAS | 124 | | CASING_PRESS | 54 | | GRAVITY_OIL | 38 | | MCF_GAS | 124 | | TUBING_PRESS | 331 |
| | Perforation Data: | | Interval Top: | 5942 ft. | # Of Holes: | 0 | | Interval Bottom: | 10247 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 498 |
| Total Gas Produced (MCF) | 11037 |
| GOR | 22162 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.553 |
| Average MCFE per Day | 38.007 |
| Federal Financial Assurance | i | |
|
|