|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2025 Measured TD: 11746 ft. Vertical TD: 7036 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/27/2016 | | Proposed Top PZ Location: | Sec:20 Twp: 2N 64W | Footage: 478 FSL 2618 FEL | | Bottom Hole Location: | Sec:20 Twp: 2N 64W | Footage: 493 FNL 2533 FEL | | Proposed Depth/Form: | 11645 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30# , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40# , Citings Type: PLANNED | | Cement: | Sacks: 198, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7416 ft., Weight: 26# , Citings Type: PLANNED | | Cement: | Sacks: 906, Top: 500 ft., Bottom: 7416 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11645 ft., Weight: 13.5# , Citings Type: PLANNED | | Cement: | Sacks: 373, Top: 7716 ft., Bottom: 11645 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/2/2014 | | Spud Date: | 8/24/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 11746 ft. | Measured PB depth: | 11731 ft. | | True Vertical TD: | 7036 ft. | True Vertical PB depth: | 7036 ft. | | Top PZ Location: | Sec:20 Twp: 2N 64W | Footage: 478 FSL 2618 FEL | | Bottom Hole Location: | Sec:20 Twp: 2N 64W | Footage: 493 FNL 2533 FEL | | Log Types: | CBL, MWD, (Resistivity 123-39723) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 143 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 143 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1082 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 1082 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7425 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 577, Top: 0 ft., Bottom: 7425 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11731 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 5306 ft., Bottom: 11731 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 6954 ft. | | | | | NIOBRARA | 7002 ft. | | | | | FORT HAYS | 7388 ft. | | | | | CODELL | 7571 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 1/9/2017 Interval Top: 7571 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation NBFHC Formation Classification: OW Status: SI - 3/1/2025 Interval Top: 7449 ft. Interval Bottom: 11677 ft.| Completed Information for Formation NIOBRARA-FT HAYS-CODELL | | 1st Production Date: | 3/8/2015 | Choke Size: | | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/31/2014 | Treatment End Date: | 1/18/2015 | | Treatment Summary: | Stages 1-29 treated with 96,801 bbls of fresh water, 426 bbls Hybrid (Gel & Slickwater), 720 bbls of HCL 15%, 1,322,297 lbs of 30/50 and 4,177,900 lbs 40/70 sand proppant | | Total fluid used in treatment (bbls): | 97947 | Max pressure during treatment (psi): | 8066 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 29 | | Total acid used in treatment (bbls): | 720 | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 780 | | Fresh water used in treatment (bbls): | 97227 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5500198 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7298 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 274 | | BBLS_OIL | 349 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 274 | | CALC_BBLS_OIL | 349 | | CALC_GOR | 885 | | CALC_MCF_GAS | 309 | | CASING_PRESS | 1836 | | GRAVITY_OIL | 50 | | MCF_GAS | 309 | | TUBING_PRESS | 1436 |
| | Perforation Data: | | Interval Top: | 7449 ft. | # Of Holes: | 759 | | Interval Bottom: | 11677 ft. | Hole Size: | 0.38 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 1/9/2017 Interval Top: 7388 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/9/2017 | Treatment End Date: | N/A | | Treatment Summary: | Stage 24-27: Top = 7743, Bottom = 8281
Stage 29: Top = 7449, Bottom = 7554
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | No | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 1/9/2017 Interval Top: 7002 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/9/2017 | Treatment End Date: | N/A | | Treatment Summary: | Stages 1-23 treated NBRR. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | No | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 9 |
| Total Gas Produced (MCF) | 6 |
| GOR | 666 |
| GOR Determination | BOE |
| Average BOE per Day | 0.030 |
| Average MCFE per Day | 0.173 |
| Federal Financial Assurance | i | |
|
|