Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39725
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:Dale #4H-20H-O264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BISON IV OPERATING LLC - 10670
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:437838LocationID:437845
County:WELD #123Location:SWSE 20 2N64W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:337FSL  1754 FELLat/Long: 40.117641 / -104.571833Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117641 / -104.571834Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2014
End Date: 12/27/2014
Reported: 2/24/2015
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 11733 ft.    Vertical TD: 7168 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2016
Proposed Top PZ Location:Sec:20 Twp: 2N 64W Footage: 615 FSL  943 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64W Footage: 490 FNL  888 FEL
Proposed Depth/Form:11801 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30# , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7565 ft., Weight: 26# , Citings Type: PLANNED
Cement:Sacks: 925, Top: 500 ft., Bottom: 7565 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11801 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 374, Top: 7265 ft., Bottom: 11801 ft.

Wellbore Completed
Completion Date:9/28/2014
Spud Date:8/19/2014Spud Date Is:ACTUAL
Measured TD:11733 ft.Measured PB depth:11717 ft.
True Vertical TD:7168 ft.True Vertical PB depth:7168 ft.
Top PZ Location:Sec:20 Twp: 2N 64WFootage: 615 FSL  943 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64WFootage: 490 FNL  888 FEL
Log Types:CBL, MWD, (Resistivity 123-39723)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 143 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 143 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1104 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1104 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7548 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 592, Top: 0 ft., Bottom: 7548 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11733 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 6190 ft., Bottom: 11733 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6875 ft.
NIOBRARA6929 ft.
FORT HAYS7429 ft.
CODELL7657 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/28/2016                Interval Top: 7657 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 1-5: Top=10822 Bottom=11733 Stages 17-28: Top=7657 Bottom=9219
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/1/2025                  Interval Top: 7429 ft.    Interval Bottom: 11733 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/8/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2014Treatment End Date:12/27/2014
Treatment Summary:Stages 1-28 treated with 68,031 bbls of fresh water, 257 bbls Hybrid (Gel & Slickwater), 245 bbls of HCL 15%, 189,129 lbs of 30/50 and 2,611,038 lbs of 40/70 sand proppant
Total fluid used in treatment (bbls):68533Max pressure during treatment (psi):8225
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):245Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):950
Fresh water used in treatment (bbls):68288Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2800167Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 242
BBLS_OIL 309
BTU_GAS 1298
CALC_BBLS_H2O 242
CALC_BBLS_OIL 309
CALC_GOR 1074
CALC_MCF_GAS 332
CASING_PRESS 1743
GRAVITY_OIL 50
MCF_GAS 332
TUBING_PRESS 1428
Perforation Data:
Interval Top:7429 ft.# Of Holes:729
Interval Bottom:11733 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/28/2016                Interval Top: 7429 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 6-16: Top=9219 Bottom=10970 Stage 28: Top= 7429 Bottom=7657
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)925
Total Gas Produced (MCF)7672
GOR8294
GOR DeterminationBOE
Average BOE per Day6.139
Average MCFE per Day35.620

 Federal Financial Assurance  i 

 Tribal Well  i No