Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39724
Well Classification: OW Status: PR - 7/1/2025
Well Name/No:Dale #4B-20H-0264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BISON IV OPERATING LLC - 10670
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2025
FacilityID:437837LocationID:437845
County:WELD #123Location:SWSE 20 2N64W 6
Field:WATTENBERG - #90750Elevation:4959 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:338FSL  1797 FELLat/Long: 40.117642 / -104.571994Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117642 / -104.571994Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/8/2015
End Date: 1/14/2015
Reported: 2/19/2015
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2025             Measured TD: 11780 ft.    Vertical TD: 7179 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2016
Proposed Top PZ Location:Sec:20 Twp: 2N 64W Footage: 480 FSL  2440 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64W Footage: 491 FNL  2315 FEL
Proposed Depth/Form:11752 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30# , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7522 ft., Weight: 26# , Citings Type: PLANNED
Cement:Sacks: 920, Top: 500 ft., Bottom: 7522 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11752 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 373, Top: 7222 ft., Bottom: 11752 ft.

Wellbore Completed
Completion Date:11/20/2014
Spud Date:8/24/2014Spud Date Is:ACTUAL
Measured TD:11780 ft.Measured PB depth:11760 ft.
True Vertical TD:7179 ft.True Vertical PB depth:7179 ft.
Top PZ Location:Sec:20 Twp: 2N 64WFootage: 480 FSL  2440 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64WFootage: 491 FNL  2315 FEL
Log Types:CBL, MWD, (Resistivity 123-39723)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 148 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 148 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1074 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 363, Top: 0 ft., Bottom: 1074 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7463 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 592, Top: 0 ft., Bottom: 7463 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11760 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 353, Top: 5238 ft., Bottom: 11760 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6928 ft.
NIOBRARA6978 ft.
FORT HAYS7282 ft.
CODELL7370 ft.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 7/1/2025                  Interval Top: 7485 ft.    Interval Bottom: 11554 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/8/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/8/2015Treatment End Date:1/14/2015
Treatment Summary:Stages 1-29 treated with 55,377 bbls of fresh water, 259 bbls Hybrid (Gel & Slickwater), 714 bbls of HCL 15%, 76,258 lbs of 30/50 and 2,588,682 40/70 sand proppant
Total fluid used in treatment (bbls):56350Max pressure during treatment (psi):8183
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):714Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):860
Fresh water used in treatment (bbls):55636Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2664940Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7272 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 336
BBLS_OIL 429
BTU_GAS 1298
CALC_BBLS_H2O 336
CALC_BBLS_OIL 429
CALC_GOR 1048
CALC_MCF_GAS 450
CASING_PRESS 1787
GRAVITY_OIL 50
MCF_GAS 450
TUBING_PRESS 1437
Perforation Data:
Interval Top:7485 ft.# Of Holes:756
Interval Bottom:11554 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 7370 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:Stages 1-7: Top=10724 Bottom=11554 Stage 12-16: Top=9396 Bottom=10084 Stage 18-28: Top=7485 Bottom=9202
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/9/2017                  Interval Top: 7282 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:Stages 8-11: Top=10131 Bottom=10670 Stage 17: Top=9249 Bottom=9349
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1737
Total Gas Produced (MCF)5413
GOR3116
GOR DeterminationBOE
Average BOE per Day7.353
Average MCFE per Day42.616

 Federal Financial Assurance  i 

 Tribal Well  i No