Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39686
Well Classification: OW Status: PR - 5/8/2015
Well Name/No:Elway State #LD01-75HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/8/2015
FacilityID:437777LocationID:437743
County:WELD #123Location:SWSE 1 9N58W 6
Field:WILDCAT - #99999Elevation:4657 ft.
Planned Location:400FSL  2275 FELLat/Long: 40.774320 / -103.810550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.774320 / -103.810550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/21/2015
End Date: 1/25/2015
Reported: 3/12/2015
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/8/2015             Measured TD: 14653 ft.    Vertical TD: 5544 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/8/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/25/2016
Prop Depth/Form:14565 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 535-451 , Unit Acreage: 3200, Drill Unit: S.1,2,11,12;S.36:All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5829 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 400, Top: , Bottom: 5829 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5679 ft., Depth: 14565 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/8/2014
Spud Date:10/30/2014Spud Date Is:ACTUAL
Measured TD:14653 ft.Measured PB depth:14629 ft.
True Vertical TD:5544 ft.True Vertical PB depth:5544 ft.
Top PZ Location:Sec:1 Twp: 9N 58WFootage: 1171 FSL  2610 FWLDepth
Bottom Hole Location:Sec:36 Twp: 10N 58WFootage: 810 FNL  2649 FWLDepth
Log Types:CBL, Mud, MWD/LWD.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.5 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1209 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 468, Top: 0 ft., Bottom: 1209 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5840 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 453, Top: 1150 ft., Bottom: 5840 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5733 ft., Depth: 14638 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2249 ft.
PARKMAN3134 ft.
SUSSEX3713 ft.
SHANNON4162 ft.
NIOBRARA5555 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/8/2015                  Interval Top: 5981 ft.    Interval Bottom: 14517 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/16/2015Treatment End Date:1/25/2015
Treatment Summary:Frac'd the Niobrara w/ 9471813 gals of Silverstim and Slik Water with 8652800#'s of Ottawa sand.
Total fluid used in treatment (bbls):225519Max pressure during treatment (psi):7482
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):93405Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):132114Disposition method For flowback:RECYCLE
Total proppant used (lbs):8652800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5763 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 805
BBLS_OIL 303
BTU_GAS 1268
CALC_BBLS_H2O 805
CALC_BBLS_OIL 303
CALC_GOR 26
CALC_MCF_GAS 8
CASING_PRESS 431
GRAVITY_OIL 38
MCF_GAS 8
TUBING_PRESS 441
Perforation Data:
Interval Top:5981 ft.# Of Holes:0
Interval Bottom:14517 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)7614
Total Gas Produced (MCF)8869
GOR1164
GOR DeterminationBOE
Average BOE per Day24.963
Average MCFE per Day144.770

 Federal Financial Assurance  i 

 Tribal Well  i No