Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39654
Well Classification: OW Status: PR - 3/31/2015
Well Name/No:McCaffrey State #LD12-75-1BHN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/31/2015
FacilityID:437727LocationID:437743
County:WELD #123Location:SWSE 1 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4656 ft.
Planned Location:250FSL  2238 FELLat/Long: 40.773900 / -103.810400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.773900 / -103.810400Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/20/2015
End Date: 2/26/2015
Reported: 3/12/2015
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/31/2015             Measured TD: 10303 ft.    Vertical TD: 5413 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/31/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/25/2016
Prop Depth/Form:10264 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 535-451 , Unit Acreage: 3200, Drill Unit: S.1,2,11,12;S.36:All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5849 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 400, Top: , Bottom: 5849 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5699 ft., Depth: 10264 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/28/2014
Spud Date:11/22/2014Spud Date Is:ACTUAL
Measured TD:10303 ft.Measured PB depth:10286 ft.
True Vertical TD:5413 ft.True Vertical PB depth:5413 ft.
Top PZ Location:Sec:12 Twp: 9N 58WFootage: 397 FNL  2200 FELDepth
Bottom Hole Location:Sec:12 Twp: 9N 58WFootage: 330 FSL  2196 FELDepth
Log Types:CBL, Mud, MWD/LWD, (DIL on 05-123-39663).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.05 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1224 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 469, Top: 0 ft., Bottom: 1224 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5797 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 412, Top: 1110 ft., Bottom: 5797 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5691 ft., Depth: 10288 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2158 ft.
PARKMAN3152 ft.
SUSSEX3754 ft.
SHANNON4198 ft.
NIOBRARA5548 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/31/2015                 Interval Top: 5936 ft.    Interval Bottom: 10206 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/23/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/17/2015Treatment End Date:2/26/2015
Treatment Summary:Frac'd the Niobrara w/ 4962013 gals of PermStim and Slick Water with 4449750#'s of Ottawa sand.
Total fluid used in treatment (bbls):118143Max pressure during treatment (psi):5488
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):47022Total flowback volume recovered (bbls):183
Fresh water used in treatment (bbls):71121Disposition method For flowback:RECYCLE
Total proppant used (lbs):4449750Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5703 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 472
BBLS_OIL 253
BTU_GAS 2768
CALC_BBLS_H2O 472
CALC_BBLS_OIL 253
CALC_GOR 268
CALC_MCF_GAS 68
CASING_PRESS 3
GRAVITY_OIL 38
MCF_GAS 68
TUBING_PRESS 288
Perforation Data:
Interval Top:5936 ft.# Of Holes:0
Interval Bottom:10206 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)2125
Total Gas Produced (MCF)6028
GOR2836
GOR DeterminationBOE
Average BOE per Day8.634
Average MCFE per Day50.084

 Federal Financial Assurance  i 

 Tribal Well  i No