Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39595
Well Classification: OW Status: SI - 4/1/2025
Well Name/No:STEWARD #13N-6HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2025
FacilityID:437547LocationID:437542
County:WELD #123Location:SESW 7 1N65W 6
Field:WATTENBERG - #90750Elevation:5004 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:442FSL  1479 FWLLat/Long: 40.059855 / -104.710705Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059849 / -104.710706Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2016
End Date: 1/8/2016
Reported: 2/29/2016
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 4/1/2025             Measured TD: 13337 ft.    Vertical TD: 7158 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2016
Proposed Top PZ Location:Sec:7 Twp: 1N 65W Footage: 100 FSL  657 FWL
Bottom Hole Location:Sec:6 Twp: 1N 65W Footage: 410 FSL  657 FWL
Proposed Depth/Form:12907 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1540 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 1540 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7732 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 820, Top: 0 ft., Bottom: 7732 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6729 ft., Depth: 13364 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/13/2014
Spud Date:9/24/2014Spud Date Is:ACTUAL
Measured TD:13337 ft.Measured PB depth:13337 ft.
True Vertical TD:7158 ft.True Vertical PB depth:7158 ft.
Top PZ Location:Sec:7 Twp: 1N 65WFootage: 191 FSL  627 FWL
Bottom Hole Location:Sec:6 Twp: 1N 65WFootage: 409 FSL  768 FWL
Log Types:CBL, LWD, Mud, (RESISTIVITY in 123-39593)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1624 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1624 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7804 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 0 ft., Bottom: 7804 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6511 ft., Depth: 13305 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4632 ft.
SHARON SPRINGS7266 ft.
NIOBRARA7311 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 4/1/2025                  Interval Top: 7843 ft.    Interval Bottom: 13337 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/4/2016Treatment End Date:1/8/2016
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7843-13,337. 36 BBL ACID, 8,265 BBL CROSSLINK GEL, 12,202 BBL LINEAR GEL, 176,949 BBL SLICKWATER, - 197,452 BBL TOTAL FLUID 6,208,795# 40/70 GENOA/SAND HILLS, - 6,208,795# TOTAL SAND."
Total fluid used in treatment (bbls):197452Max pressure during treatment (psi):7530
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7562
Fresh water used in treatment (bbls):197416Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6208795Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 298
BBLS_OIL 65
BTU_GAS 1369
CALC_BBLS_H2O 298
CALC_BBLS_OIL 65
CALC_GOR 1292
CALC_MCF_GAS 84
CASING_PRESS 1800
GRAVITY_OIL 47
MCF_GAS 84
Perforation Data:
Interval Top:7843 ft.# Of Holes:0
Interval Bottom:13337 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.008

 Federal Financial Assurance  i 

 Tribal Well  i No