|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2022 Measured TD: 12949 ft. Vertical TD: 7244 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/7/2016 | Proposed Top PZ Location: | Sec:26 Twp: 3N 68W | Footage: 808 FSL 380 FEL | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 817 FSL 273 FEL | Proposed Depth/Form: | 13009 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1234 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1234 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7735 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 820, Top: 0 ft., Bottom: 7735 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6735 ft., Depth: 13009 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 10/8/2014 | Spud Date: | 8/27/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12949 ft. | Measured PB depth: | 12925 ft. | True Vertical TD: | 7244 ft. | True Vertical PB depth: | 7244 ft. | Top PZ Location: | Sec:26 Twp: 3N 68W | Footage: 808 FSL 380 FEL | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 817 S 273 E | Log Types: | CBL, GR, MUD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1218 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 514, Top: 0 ft., Bottom: 1218 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7743 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 14 ft., Bottom: 7743 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6785 ft., Depth: 12934 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4196 ft. | | | | SHARON SPRINGS | 7083 ft. | | | | NIOBRARA | 7173 ft. | | | | FORT HAYS | 7598 ft. | | | | CODELL | 7778 ft. | | | |
Formation CODL Formation Classification: OG Status: CM - 1/21/2015 Interval Top: 7778 ft. Interval Bottom: 12949 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7778 ft. | # Of Holes: | 0 | Interval Bottom: | 12949 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OG Status: PR - 12/1/2022 Interval Top: 7772 ft. Interval Bottom: 12949 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 12/31/2014 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/10/2014 | Treatment End Date: | 12/12/2014 | Treatment Summary: | "COMPLETED THROUGH AN OPEN HOLE LINER FROM 7772-12,949.
24 BBL ACID, 95,510 BBL SLICKWATER, - 95,534 BBL TOTAL FLUID
2,749,302# 40/70 GENOA/SAND HILLS, - 2,749,302# TOTAL SAND."
| Total fluid used in treatment (bbls): | 95534 | Max pressure during treatment (psi): | 6349 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 28 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 331 | Fresh water used in treatment (bbls): | 95510 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2749303 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/18/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 446 | BBLS_OIL | 136 | BTU_GAS | 1286 | CALC_BBLS_H2O | 446 | CALC_BBLS_OIL | 136 | CALC_GOR | 1294 | CALC_MCF_GAS | 176 | CASING_PRESS | 600 | GRAVITY_OIL | 47 | MCF_GAS | 176 |
| Perforation Data: | Interval Top: | 7772 ft. | # Of Holes: | 0 | Interval Bottom: | 12949 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OG Status: CM - 1/21/2015 Interval Top: 7598 ft. Interval Bottom: 7778 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7598 ft. | # Of Holes: | 0 | Interval Bottom: | 7778 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2922 |
Total Gas Produced (MCF) | 27828 |
GOR | 9523 |
GOR Determination | BOE |
Average BOE per Day | 21.086 |
Average MCFE per Day | 122.319 |
Federal Financial Assurance | i | |
|
|