|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/10/2016 Measured TD: 15767 ft. Vertical TD: 7135 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/10/2016 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/9/2018 | Prop Depth/Form: | 17337 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1349 , Unit Acreage: 1280, Drill Unit: S: 8 & 9 All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: , Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1500, Top: 1450 ft., Bottom: | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7500 ft., Depth: 17434 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/6/2016 | Spud Date: | 7/6/2016 | Spud Date Is: | ACTUAL | Measured TD: | 15767 ft. | Measured PB depth: | 15767 ft. | True Vertical TD: | 7135 ft. | True Vertical PB depth: | 7135 ft. | Top PZ Location: | Sec:8 Twp: 6N 67W | Footage: 1494 FNL 1806 FWL | Depth | Bottom Hole Location: | Sec:8 Twp: 6N 67W | Footage: 1494 FNL 1806 FWL | Depth | Log Types: | Mud, (Triple Combo on 123-39574). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1541 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1541 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 1541 ft., Depth: 15767 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3612 ft. | | N | N | SUSSEX | 4445 ft. | | N | N | SHANNON | 4774 ft. | | N | N | SHARON SPRINGS | 7081 ft. | | N | N | NIOBRARA | 7127 ft. | | N | N | FORT HAYS | 7562 ft. | | N | N | CODELL | 7760 ft. | | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: AB - 11/10/2016 Measured TD: 13119 ft. Vertical TD: 7144 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW AB - 11/10/2016 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/18/2018 | Prop Depth/Form: | 17337 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1349 , Unit Acreage: 1280, Drill Unit: S: 8 & 9 All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1562 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1562 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17337 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1500, Top: 1450 ft., Bottom: 17337 ft. |
| | |
Wellbore Completed | Completion Date: | 7/6/2016 | Spud Date: | 7/6/2016 | Spud Date Is: | ACTUAL | Measured TD: | 13119 ft. | Measured PB depth: | 13119 ft. | True Vertical TD: | 7144 ft. | True Vertical PB depth: | 7144 ft. | Top PZ Location: | Sec:8 Twp: 6N 67W | Footage: 1611 FNL 828 FEL | Depth | Bottom Hole Location: | Sec:8 Twp: 6N 67W | Footage: 1611 FNL 828 FEL | Depth | Log Types: | Mud, (Triple Combo on 123-39574). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1541 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1541 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 1541 ft., Depth: 13119 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3612 ft. | | N | N | SUSSEX | 4445 ft. | | N | N | SHANNON | 4774 ft. | | N | N | SHARON SPRINGS | 7081 ft. | | N | N | NIOBRARA | 7127 ft. | | N | N | FORT HAYS | 7562 ft. | | N | N | CODELL | 7760 ft. | | N | N | No formation data to display. |
Sidetrack #02 Wellbore Classification: OW Status: PR - 7/1/2021 Measured TD: 17068 ft. Vertical TD: 7131 ft. Wellbore Data for Sidetrack #02 | Wellbore Classification: OW PR - 7/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/23/2018 | Prop Depth/Form: | 17337 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1349 , Unit Acreage: 1280, Drill Unit: S: 8 & 9 All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1541 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1541 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17337 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1500, Top: 1450 ft., Bottom: 17337 ft. |
| | |
Wellbore Completed | Completion Date: | 8/28/2016 | Spud Date: | 7/6/2016 | Spud Date Is: | ACTUAL | Measured TD: | 17068 ft. | Measured PB depth: | 17056 ft. | True Vertical TD: | 7131 ft. | True Vertical PB depth: | 7131 ft. | Top PZ Location: | Sec:9 Twp: 6N 67W | Footage: 1628 FNL 497 FEL | Depth | Bottom Hole Location: | Sec:8 Twp: 6N 67W | Footage: 1515 FNL 510 FWL | Depth | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-39574). | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1541 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1541 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17061 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2200, Top: 1160 ft., Bottom: 17061 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3612 ft. | | N | N | SUSSEX | 4445 ft. | | N | N | SHANNON | 4774 ft. | | N | N | SHARON SPRINGS | 7081 ft. | | N | N | NIOBRARA | 7127 ft. | | N | N | FORT HAYS | 7562 ft. | | N | N | CODELL | 7760 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: CM - 5/1/2019 Interval Top: 16576 ft. Interval Bottom: 17009 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/6/2017 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2017 | Treatment End Date: | 1/25/2017 | Treatment Summary: | Perforated Interval: 16576'-17009'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 16576 ft. | # Of Holes: | 81 | Interval Bottom: | 17009 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/1/2019 Interval Top: 7765 ft. Interval Bottom: 16538 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/6/2017 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2017 | Treatment End Date: | 1/25/2017 | Treatment Summary: | Perforated Intervals: 7765'-10098'; 10499'-12915'; 13037'-14566'; 14699'-16538'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7765 ft. | # Of Holes: | 1480 | Interval Bottom: | 16538 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 5/1/2019 Interval Top: 7564 ft. Interval Bottom: 14654 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 5/6/2017 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2017 | Treatment End Date: | 1/25/2017 | Treatment Summary: | Perforated Intervals: 7564'-7723'; 10136'-10461'; 12958'-13003'; 14607'-14654'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7564 ft. | # Of Holes: | 126 | Interval Bottom: | 14654 ft. | Hole Size: | 0.42 in. |
|
Formation NBFHC Formation Classification: OW Status: PR - 7/1/2021 Interval Top: 7564 ft. Interval Bottom: 17009 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 5/6/2017 | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/17/2017 | Treatment End Date: | 1/25/2017 | Treatment Summary: | Frac'd Niobrara-Fort Hays-Codell with 48-stage plug-and-perf;
141849 total bbls fluid pumped: 127463 bbls gelled fluid, 14374 bbls fresh water, and 12 bbls 28% HCl acid;
9615420 total lbs proppant pumped: all 30/50 sand. | Total fluid used in treatment (bbls): | 141849 | Max pressure during treatment (psi): | 9662 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 26234 | Fresh water used in treatment (bbls): | 14374 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9615420 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7339 ft. | Tubing Packer Depth: | 7318 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/8/2017 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1464 | BBLS_OIL | 275 | BTU_GAS | 1401 | CALC_BBLS_H2O | 1464 | CALC_BBLS_OIL | 275 | CALC_GOR | 1029 | CALC_MCF_GAS | 283 | CASING_PRESS | 1200 | GRAVITY_OIL | 41 | MCF_GAS | 283 | TUBING_PRESS | 1748 |
| Perforation Data: | Interval Top: | 7564 ft. | # Of Holes: | 1687 | Interval Bottom: | 17009 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 2946 |
Total Gas Produced (MCF) | 52731 |
GOR | 17899 |
GOR Determination | MCFE |
Average BOE per Day | 32.902 |
Average MCFE per Day | 190.840 |
Federal Financial Assurance | i | |
|
|