|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2022 Measured TD: 13129 ft. Vertical TD: 7289 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/25/2016 | | Proposed Top PZ Location: | Sec:26 Twp: 3N 68W | Footage: 381 FNL 444 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 228 FNL 299 FEL | | Proposed Depth/Form: | 13529 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 1161 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8026 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 0 ft., Bottom: 8026 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6780 ft., Depth: 13529 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/19/2014 | | Spud Date: | 8/19/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 13129 ft. | Measured PB depth: | 13099 ft. | | True Vertical TD: | 7289 ft. | True Vertical PB depth: | 7289 ft. | | Top PZ Location: | Sec:26 Twp: 3N 68W | Footage: 381 FNL 444 FEL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 228 FNL 299 FEL | | Log Types: | CBL, LWD, MUD, (RESISTIVITY in 05-123-23882, 05-123-26222, 05-123-23108) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1236 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 476, Top: 0 ft., Bottom: 1236 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7865 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 100 ft., Bottom: 7865 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6858 ft., Depth: 13109 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST LINER , Top: 6889 ft., Depth: 6835 ft., Bottom: 7928 ft., Sacks: 145, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4145 ft. | | | | | SHARON SPRINGS | 7169 ft. | | | | | NIOBRARA | 7262 ft. | | | | | FORT HAYS | 7675 ft. | | | | | CODELL | 7744 ft. | | | | | CARLILE | 8675 ft. | | | |
Formation CD-CRL Formation Classification: OW Status: PR - 12/1/2022 Interval Top: 7985 ft. Interval Bottom: 12800 ft.| Completed Information for Formation CODELL-CARLILE | | 1st Production Date: | 4/19/2015 | Choke Size: | | | Formation Name: | CODELL-CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/8/2015 | Treatment End Date: | 4/10/2015 | | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7985-12800.
26356 BBL CROSSLINK GEL, 3473 BBL LINEAR GEL, 69969 BBL SLICKWATER, 99797 BBL TOTAL FLUID.
814826# 30/50 UNIMIN CORP, 2080218# 40/70 GENOA/SAND HILLS, 2895045# TOTAL SAND.
Codell 7985-8675, 8975-12734
Carlile 8675-8975, 12734-12800
SEE ATTACHMENT
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL. | | Total fluid used in treatment (bbls): | 99797 | Max pressure during treatment (psi): | 6869 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 17066 | | Fresh water used in treatment (bbls): | 99797 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2895045 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/23/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 71 | | BTU_GAS | 1316 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 71 | | CALC_GOR | 2915 | | CALC_MCF_GAS | 207 | | CASING_PRESS | 300 | | GRAVITY_OIL | 47 | | MCF_GAS | 207 |
| | Perforation Data: | | Interval Top: | 7985 ft. | # Of Holes: | 0 | | Interval Bottom: | 12800 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2076 |
| Total Gas Produced (MCF) | 17901 |
| GOR | 8622 |
| GOR Determination | BOE |
| Average BOE per Day | 14.128 |
| Average MCFE per Day | 81.939 |
| Federal Financial Assurance | i | |
|
|