Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39498
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:CRUICKSHANK #1C-24HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:437343LocationID:329103
County:WELD #123Location:SESE 24 3N66W 6
Field:WATTENBERG - #90750Elevation:5014 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:634FSL  664 FELLat/Long: 40.205369 / -104.718134Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.205372 / -104.718133Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2015
End Date: 3/23/2015
Reported: 5/11/2015
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 13661 ft.    Vertical TD: 7422 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/25/2016
Proposed Top PZ Location:Sec:25 Twp: 3N 66W Footage: 321 FNL  137 FEL
Bottom Hole Location:Sec:24 Twp: 3N 66W Footage: 2 FNL  160 FEL
Proposed Depth/Form:13672 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8034 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 8034 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7034 ft., Depth: 13672 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/18/2014
Spud Date:7/13/2014Spud Date Is:ACTUAL
Measured TD:13661 ft.Measured PB depth:13604 ft.
True Vertical TD:7422 ft.True Vertical PB depth:7421 ft.
Top PZ Location:Sec:25 Twp: 3N 66WFootage: 321 FNL  137 FEL
Bottom Hole Location:Sec:24 Twp: 3N 66WFootage: 2 FNL  160 FEL
Log Types:CBL, LWD with GR, MUD, (IND in API# 05-123-16872)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1221 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 476, Top: 0 ft., Bottom: 1221 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8047 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 7 ft., Bottom: 8047 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7046 ft., Depth: 13651 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 7046 ft., Bottom: 13651 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4683 ft.
SHARON SPRINGS7377 ft.
NIOBRARA7447 ft.
FORT HAYS7877 ft.
CODELL8000 ft.
CARLILE8501 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/20/2016                Interval Top: 8502 ft.    Interval Bottom: 11675 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/20/2016Treatment End Date:N/A
Treatment Summary:CARLILE: 8502-8593; 11,452-11,675
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8502 ft.# Of Holes:636
Interval Bottom:11675 ft.Hole Size:0.37 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 2/1/2025                  Interval Top: 8067 ft.    Interval Bottom: 13574 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/28/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2015Treatment End Date:3/23/2015
Treatment Summary:"PERF AND FRAC FROM 8067-13,574. 321 BBL ACID, 98,470 BBL SLICKWATER, - 98,791 BBL TOTAL FLUID 1,002,500# 30/50 OTTAWA/ST. PETERS, 1,750,550# 40/70 OTTAWA/ST. PETERS, - 2,753,050# TOTAL SAND." ENTERED: FT HAYS: 7880-7996; 9180-9252; 9456-9621; 11,084-11,220 CODEL: 7997-8501; 8594-9455; 9622-11,083; 11,221-11,451; 11,676-13,574 CARLILE: 8502-8593; 11,452-11,675 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL. (SEE ATTACHMENT)
Total fluid used in treatment (bbls):98791Max pressure during treatment (psi):7222
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):321Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):976
Fresh water used in treatment (bbls):98470Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2753050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 600
BBLS_OIL 124
BTU_GAS 1207
CALC_BBLS_H2O 600
CALC_BBLS_OIL 124
CALC_GOR 4758
CALC_MCF_GAS 590
CASING_PRESS 525
GRAVITY_OIL 56
MCF_GAS 590
Perforation Data:
Interval Top:8067 ft.# Of Holes:636
Interval Bottom:13574 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/20/2016                Interval Top: 7997 ft.    Interval Bottom: 13574 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/20/2016Treatment End Date:N/A
Treatment Summary:CODEL: 7997-8501; 8594-9455; 9622-11,083; 11,221-11,451; 11,676-13,574
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7997 ft.# Of Holes:636
Interval Bottom:13574 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/20/2016                Interval Top: 7880 ft.    Interval Bottom: 11220 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/20/2016Treatment End Date:N/A
Treatment Summary:FT HAYS: 7880-7996; 9180-9252; 9456-9621; 11,084-11,220
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7880 ft.# Of Holes:636
Interval Bottom:11220 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3040
Total Gas Produced (MCF)60263
GOR19823
GOR DeterminationMCFE
Average BOE per Day36.669
Average MCFE per Day212.671

 Federal Financial Assurance  i 

 Tribal Well  i No