|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2025 Measured TD: 13661 ft. Vertical TD: 7422 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/25/2016 | Proposed Top PZ Location: | Sec:25 Twp: 3N 66W | Footage: 321 FNL 137 FEL | Bottom Hole Location: | Sec:24 Twp: 3N 66W | Footage: 2 FNL 160 FEL | Proposed Depth/Form: | 13672 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 440, Top: 0 ft., Bottom: 1161 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8034 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 850, Top: 0 ft., Bottom: 8034 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7034 ft., Depth: 13672 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/18/2014 | Spud Date: | 7/13/2014 | Spud Date Is: | ACTUAL | Measured TD: | 13661 ft. | Measured PB depth: | 13604 ft. | True Vertical TD: | 7422 ft. | True Vertical PB depth: | 7421 ft. | Top PZ Location: | Sec:25 Twp: 3N 66W | Footage: 321 FNL 137 FEL | Bottom Hole Location: | Sec:24 Twp: 3N 66W | Footage: 2 FNL 160 FEL | Log Types: | CBL, LWD with GR, MUD, (IND in API# 05-123-16872) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1221 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 476, Top: 0 ft., Bottom: 1221 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8047 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 840, Top: 7 ft., Bottom: 8047 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7046 ft., Depth: 13651 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 7046 ft., Bottom: 13651 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4683 ft. | | | | SHARON SPRINGS | 7377 ft. | | | | NIOBRARA | 7447 ft. | | | | FORT HAYS | 7877 ft. | | | | CODELL | 8000 ft. | | | | CARLILE | 8501 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 12/20/2016 Interval Top: 8502 ft. Interval Bottom: 11675 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 12/20/2016 | Treatment End Date: | N/A | Treatment Summary: | CARLILE: 8502-8593; 11,452-11,675
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8502 ft. | # Of Holes: | 636 | Interval Bottom: | 11675 ft. | Hole Size: | 0.37 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 2/1/2025 Interval Top: 8067 ft. Interval Bottom: 13574 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 3/28/2014 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/19/2015 | Treatment End Date: | 3/23/2015 | Treatment Summary: | "PERF AND FRAC FROM 8067-13,574.
321 BBL ACID, 98,470 BBL SLICKWATER, - 98,791 BBL TOTAL FLUID
1,002,500# 30/50 OTTAWA/ST. PETERS, 1,750,550# 40/70 OTTAWA/ST. PETERS, - 2,753,050# TOTAL SAND."
ENTERED:
FT HAYS: 7880-7996; 9180-9252; 9456-9621; 11,084-11,220
CODEL: 7997-8501; 8594-9455; 9622-11,083; 11,221-11,451; 11,676-13,574
CARLILE: 8502-8593; 11,452-11,675
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL.
(SEE ATTACHMENT)
| Total fluid used in treatment (bbls): | 98791 | Max pressure during treatment (psi): | 7222 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 18 | Total acid used in treatment (bbls): | 321 | Min frac gradient (psi/ft): | 0.69 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 976 | Fresh water used in treatment (bbls): | 98470 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2753050 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/4/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 600 | BBLS_OIL | 124 | BTU_GAS | 1207 | CALC_BBLS_H2O | 600 | CALC_BBLS_OIL | 124 | CALC_GOR | 4758 | CALC_MCF_GAS | 590 | CASING_PRESS | 525 | GRAVITY_OIL | 56 | MCF_GAS | 590 |
| Perforation Data: | Interval Top: | 8067 ft. | # Of Holes: | 636 | Interval Bottom: | 13574 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/20/2016 Interval Top: 7997 ft. Interval Bottom: 13574 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 12/20/2016 | Treatment End Date: | N/A | Treatment Summary: | CODEL: 7997-8501; 8594-9455; 9622-11,083; 11,221-11,451; 11,676-13,574
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7997 ft. | # Of Holes: | 636 | Interval Bottom: | 13574 ft. | Hole Size: | 0.37 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 12/20/2016 Interval Top: 7880 ft. Interval Bottom: 11220 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 12/20/2016 | Treatment End Date: | N/A | Treatment Summary: | FT HAYS: 7880-7996; 9180-9252; 9456-9621; 11,084-11,220
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7880 ft. | # Of Holes: | 636 | Interval Bottom: | 11220 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4980 |
Total Gas Produced (MCF) | 76493 |
GOR | 15360 |
GOR Determination | MCFE |
Average BOE per Day | 49.526 |
Average MCFE per Day | 287.243 |
Federal Financial Assurance | i | |
|
|