Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39439
Well Classification: OW Status: PA - 9/28/2021
Well Name/No:FRONT RANGE FARMS #37C-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/28/2021
FacilityID:437189LocationID:437179
County:WELD #123Location:NESE 11 1N68W 6
Field:WATTENBERG - #90750Elevation:5067 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2441FSL  731 FELLat/Long: 40.065218 / -104.963804Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.065220 / -104.963805Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/4/2015
End Date: 12/9/2015
Reported: 1/29/2016
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/24/2021             Measured TD: 15352 ft.    Vertical TD: 7829 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/24/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/14/2016
Proposed Top PZ Location:Sec:11 Twp: 1N 68W Footage: 2204 FSL  912 FEL
Bottom Hole Location:Sec:14 Twp: 1N 68W Footage: 50 FSL  912 FEL
Proposed Depth/Form:15540 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8166 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8166 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7132 ft., Depth: 15540 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/27/2014
Spud Date:10/23/2014Spud Date Is:ACTUAL
Measured TD:15352 ft.Measured PB depth:15300 ft.
True Vertical TD:7829 ft.True Vertical PB depth:7828 ft.
Top PZ Location:Sec:11 Twp: 1N 68WFootage: 1987 FSL  898 FEL
Bottom Hole Location:Sec:14 Twp: 1N 68WFootage: 50 FSL  925 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1339 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 0 ft., Bottom: 1339 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 8190 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 686, Top: 360 ft., Bottom: 8190 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7139 ft., Depth: 15384 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 7155 ft., Bottom: 15352 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
SUSSEX4615 ft.
SHARON SPRINGS7486 ft.
NIOBRARA7541 ft.
FORT HAYS8033 ft.
CODELL8215 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/6/2016                 Interval Top: 13505 ft.    Interval Bottom: 13614 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2016Treatment End Date:N/A
Treatment Summary:CARLILE 13,505-13,614
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13505 ft.# Of Holes:576
Interval Bottom:13614 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/6/2016                 Interval Top: 8218 ft.    Interval Bottom: 15627 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2016Treatment End Date:N/A
Treatment Summary:CODELL 8218-11,837; 11,854-13,505;, 13,614-15,267;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8218 ft.# Of Holes:576
Interval Bottom:15627 ft.Hole Size:0.46 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  AB - 9/28/2021                 Interval Top: 8210 ft.    Interval Bottom: 15267 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/22/2015Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/4/2015Treatment End Date:12/9/2015
Treatment Summary:"PERF AND FRAC FROM 8210-15267. 36 BBL 7.5% HCL ACID, 125,472 BBL SLICKWATER, 5,863 BBL WATER, - 131,371 BBL TOTAL FLUID 3,864,967# 40/70 GENOA/SAND HILLS, 3,864,967# TOTAL SAND.
Total fluid used in treatment (bbls):131371Max pressure during treatment (psi):7430
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2571
Fresh water used in treatment (bbls):131335Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3864967Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/30/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BBLS_OIL 312
BTU_GAS 1391
CALC_BBLS_H2O 73
CALC_BBLS_OIL 312
CALC_GOR 1529
CALC_MCF_GAS 477
CASING_PRESS 1250
GRAVITY_OIL 48
MCF_GAS 477
Perforation Data:
Interval Top:8210 ft.# Of Holes:576
Interval Bottom:15267 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/6/2016                 Interval Top: 8210 ft.    Interval Bottom: 11854 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2016Treatment End Date:N/A
Treatment Summary:FT HAYS 8210-8218; 11,837-11,854
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8210 ft.# Of Holes:576
Interval Bottom:11854 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/28/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No