Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39427
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:SACK #2C-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:437163LocationID:437161
County:WELD #123Location:SWSE 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5041 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:880FSL  1889 FELLat/Long: 40.002755 / -104.930446Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002757 / -104.930444Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/14/2015
End Date: 3/24/2015
Reported: 5/19/2015
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 17262 ft.    Vertical TD: 7778 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/14/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 1498 FSL  1978 FEL
Bottom Hole Location:Sec:30 Twp: 1N 67W Footage: 25 FNL  1840 FEL
Proposed Depth/Form:17304 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1265 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 1265 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8184 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8184 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7181 ft., Depth: 17304 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/12/2014
Spud Date:7/28/2014Spud Date Is:ACTUAL
Measured TD:17262 ft.Measured PB depth:17205 ft.
True Vertical TD:7778 ft.True Vertical PB depth:7779 ft.
Top PZ Location:Sec:31 Twp: 1N 67WFootage: 1498 FSL  1978 FEL
Bottom Hole Location:Sec:30 Twp: 1N 67WFootage: 25 FNL  1840 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1334 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 1334 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8206 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 30 ft., Bottom: 8206 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7146 ft., Depth: 17251 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 7146 ft., Bottom: 17251 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX5058 ft.
SHARON SPRINGS7365 ft.
NIOBRARA7395 ft.
FORT HAYS8010 ft.
CODELL8106 ft.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 3/1/2025                  Interval Top: 8220 ft.    Interval Bottom: 17133 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/23/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/14/2015Treatment End Date:3/24/2015
Treatment Summary:"PERF AND FRAC FROM 8220-17,133. 36 BBL ACID, 163,939 BBL SLICKWATER, 9,315 BBL WATER, - 173,289 BBL TOTAL FLUID 4,981,790# 40/70 GENOA/SAND HILLS, - 4,981,790# TOTAL SAND." ENTERED FT HAYS 8007-8099; 8350-8880 CODELL 8100-8349; 8881-17,133 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL; (SEE ATTACHMENT)
Total fluid used in treatment (bbls):173289Max pressure during treatment (psi):7736
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2170
Fresh water used in treatment (bbls):173253Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4981790Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 180
BTU_GAS 1344
CALC_BBLS_OIL 180
CALC_GOR 2083
CALC_MCF_GAS 375
CASING_PRESS 680
GRAVITY_OIL 46
MCF_GAS 375
Perforation Data:
Interval Top:8220 ft.# Of Holes:1038
Interval Bottom:17133 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/13/2016                Interval Top: 8100 ft.    Interval Bottom: 17133 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/13/2016Treatment End Date:N/A
Treatment Summary:CODELL 8100-8349; 8881-17,133
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8100 ft.# Of Holes:1038
Interval Bottom:17133 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/13/2016                Interval Top: 8007 ft.    Interval Bottom: 8880 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/13/2016Treatment End Date:N/A
Treatment Summary:ENTERED FT HAYS 8007-8099; 8350-8880
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8007 ft.# Of Holes:1038
Interval Bottom:8880 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)478
Total Gas Produced (MCF)13118
GOR27443
GOR DeterminationMCFE
Average BOE per Day7.498
Average MCFE per Day43.501

 Federal Financial Assurance  i 

 Tribal Well  i No