Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39423
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:SACK #15C-6HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:437158LocationID:437161
County:WELD #123Location:SWSE 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5041 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:831FSL  1942 FELLat/Long: 40.002621 / -104.930635Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002622 / -104.930633Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/25/2015
End Date: 3/28/2015
Reported: 5/19/2015
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 12801 ft.    Vertical TD: 7857 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/14/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 260 FSL  1710 FEL
Bottom Hole Location:Sec:6 Twp: 1S 67W Footage: 460 FSL  2170 FEL
Proposed Depth/Form:13098 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1265 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 1265 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8200 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8200 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7203 ft., Depth: 13098 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/5/2014
Spud Date:8/3/2014Spud Date Is:ACTUAL
Measured TD:12801 ft.Measured PB depth:12750 ft.
True Vertical TD:7857 ft.True Vertical PB depth:7857 ft.
Top PZ Location:Sec:6 Twp: 1S 67WFootage: 36 FNL  1655 FEL
Bottom Hole Location:Sec:6 Twp: 1S 67WFootage: 486 FSL  2107 FEL
Log Types:CBL, MWD with GR, MUD, (MWD with RES in API# 05-123-39427)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1323 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 1323 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8224 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 32 ft., Bottom: 8224 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7215 ft., Depth: 12796 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 7215 ft., Bottom: 12796 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5076 ft.
SHARON SPRINGS7408 ft.
NIOBRARA7439 ft.
FORT HAYS8029 ft.
CODELL8118 ft.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 3/1/2025                  Interval Top: 8234 ft.    Interval Bottom: 12718 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/23/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/25/2015Treatment End Date:3/28/2015
Treatment Summary:"PERF AND FRAC FROM 8234-12,718. 78,587 BBL SLICKWATER, 2,233 BBL WATER, - 80,820 BBL TOTAL FLUID 2,363,052# 40/70 GENOA/SAND HILLS, - 2,363,052# TOTAL SAND. ENTERED FT. HAYS: 8026-8116; 9732-10,484 CODELL: 8117-9731; 10,485-12,718" THIS IS A DESIGNATED SOURCE OF SUPPLY WELL; (SEE ATTACHMENT)
Total fluid used in treatment (bbls):80820Max pressure during treatment (psi):7668
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8434
Fresh water used in treatment (bbls):80820Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2363052Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 160
BBLS_OIL 155
BTU_GAS 1344
CALC_BBLS_H2O 160
CALC_BBLS_OIL 155
CALC_GOR 1935
CALC_MCF_GAS 300
CASING_PRESS 1750
GRAVITY_OIL 46
MCF_GAS 300
Perforation Data:
Interval Top:8234 ft.# Of Holes:536
Interval Bottom:12718 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/15/2017                 Interval Top: 8117 ft.    Interval Bottom: 12718 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:2/15/2017Treatment End Date:N/A
Treatment Summary:CODELL: 8117-9731; 10,485-12,718"
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8117 ft.# Of Holes:536
Interval Bottom:12718 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/15/2017                 Interval Top: 8026 ft.    Interval Bottom: 10484 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:2/15/2017Treatment End Date:N/A
Treatment Summary:ENTERED FT. HAYS: 8026-8116; 9732-10,484
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8026 ft.# Of Holes:536
Interval Bottom:10484 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)571
Total Gas Produced (MCF)12751
GOR22330
GOR DeterminationMCFE
Average BOE per Day7.584
Average MCFE per Day44.006

 Federal Financial Assurance  i 

 Tribal Well  i No