Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39378
Well Classification: GW Status: PR - 4/1/2019
Well Name/No:SICKLER #2C-34HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2019
FacilityID:437023LocationID:436869
County:WELD #123Location:SWSE 34 2N67W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:345FSL  1521 FELLat/Long: 40.088456 / -104.873108Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.088455 / -104.873108Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/11/2014
End Date: 1/9/2015
Reported: 3/3/2015
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2019             Measured TD: 13224 ft.    Vertical TD: 7588 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/2/2016
Proposed Top PZ Location:Sec:34 Twp: 2N 67W Footage: 50 FSL  1950 FEL
Bottom Hole Location:Sec:34 Twp: 2N 67W Footage: 50 FNL  1950 FEL
Proposed Depth/Form:13264 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1208 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 460, Top: 0 ft., Bottom: 1208 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8071 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 0 ft., Bottom: 8071 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7067 ft., Depth: 13264 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/28/2014
Spud Date:5/25/2014Spud Date Is:ACTUAL
Measured TD:13224 ft.Measured PB depth:13224 ft.
True Vertical TD:7588 ft.True Vertical PB depth:7588 ft.
Top PZ Location:Sec:34 Twp: 2N 67WFootage: 90 FSL  1956 FEL
Bottom Hole Location:Sec:34 Twp: 2N 67WFootage: 50 FNL  1946 FEL
Log Types:CBL,GR,MUD,OH
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1275 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 1275 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8070 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 30 ft., Bottom: 8070 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7042 ft., Depth: 13209 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4580 ft.
SHARON SPRINGS7342 ft.
NIOBRARA7407 ft.
FORT HAYS7879 ft.
CODELL8044 ft.

Formation CD-FH                   Formation Classification:  GW                   Status:  PR - 4/1/2019                  Interval Top: 8120 ft.    Interval Bottom: 13224 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:1/16/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/11/2014Treatment End Date:1/9/2015
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8120-13224. 49962 BBL CROSSLINK GEL, 13996 BBL SLICKWATER, 63958 BBL TOTAL FLUID. 2552900# 40/70 ECONOPROP, 2552900# TOTAL SAND.
Total fluid used in treatment (bbls):63958Max pressure during treatment (psi):7672
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4051
Fresh water used in treatment (bbls):63958Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2552900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/28/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 107
BBLS_OIL 71
BTU_GAS 1258
CALC_BBLS_H2O 107
CALC_BBLS_OIL 71
CALC_GOR 1014
CALC_MCF_GAS 72
CASING_PRESS 1500
GRAVITY_OIL 45
MCF_GAS 72
Perforation Data:
Interval Top:8120 ft.# Of Holes:0
Interval Bottom:13224 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1581
Total Gas Produced (MCF)40263
GOR25466
GOR DeterminationMCFE
Average BOE per Day23.428
Average MCFE per Day135.875

 Federal Financial Assurance  i 

 Tribal Well  i No