|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2025 Measured TD: 12352 ft. Vertical TD: 7313 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/1/2016 | | Proposed Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 2019 FSL 460 FWL | | Bottom Hole Location: | Sec:11 Twp: 3N 68W | Footage: 2025 FSL 470 FEL | | Proposed Depth/Form: | 12369 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-833 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 61, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1025 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 426, Top: 0 ft., Bottom: 1025 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 23 ft., Depth: 8024 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 735, Top: 725 ft., Bottom: 8024 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7273 ft., Depth: 12370 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 10/24/2014 | | Spud Date: | 8/18/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12352 ft. | Measured PB depth: | 12301 ft. | | True Vertical TD: | 7313 ft. | True Vertical PB depth: | 7313 ft. | | Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 1981 FSL 543 FWL | | Bottom Hole Location: | Sec:11 Twp: 3N 68W | Footage: 2015 FSL 477 FEL | | Log Types: | CBL, gamma ray, resistivity log in 05-123-39322 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1065 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1065 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7953 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 75 ft., Bottom: 7953 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7680 ft., Depth: 12347 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7680 ft., Bottom: 12347 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3616 ft. | 3949 ft. | N | N | | SUSSEX | 4113 ft. | 4281 ft. | N | N | | SHANNON | 4614 ft. | 4743 ft. | N | N | | SHARON SPRINGS | 7241 ft. | 7458 ft. | N | N | | NIOBRARA | 7459 ft. | 7931 ft. | N | N | | FORT HAYS | 7932 ft. | 8000 ft. | N | N | | CODELL | 8001 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 4/1/2025 Interval Top: 8087 ft. Interval Bottom: 12207 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/16/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/26/2014 | Treatment End Date: | 12/9/2014 | | Treatment Summary: | Total Fluid: 66135 bbls. Total proppant: 3947219 lbs; 193,389 premium white 40/70, 2,048,527 premium white 20/40, 274,850 CRC 20/40 1,430,453 premium white 30/50. | | Total fluid used in treatment (bbls): | 66135 | Max pressure during treatment (psi): | 8609 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 21 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 18474 | | Fresh water used in treatment (bbls): | 66135 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3947219 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7776 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/17/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 184 | | BBLS_OIL | 565 | | BTU_GAS | 1286 | | CALC_BBLS_H2O | 184 | | CALC_BBLS_OIL | 565 | | CALC_GOR | 990 | | CALC_MCF_GAS | 562 | | CASING_PRESS | 1546 | | GRAVITY_OIL | 44 | | MCF_GAS | 562 | | TUBING_PRESS | 1504 |
| | Perforation Data: | | Interval Top: | 8087 ft. | # Of Holes: | 630 | | Interval Bottom: | 12207 ft. | Hole Size: | 0.4285714 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 457 |
| Total Gas Produced (MCF) | 4157 |
| GOR | 9096 |
| GOR Determination | BOE |
| Average BOE per Day | 3.172 |
| Average MCFE per Day | 18.393 |
| Federal Financial Assurance | i | |
|
|