Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39319
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:Postle IC #11-002HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:436903LocationID:433857
County:WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1460FNL  386 FWLLat/Long: 40.243961 / -104.978400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243961 / -104.978400Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/17/2017
End Date: 4/28/2017
Reported: 5/26/2017
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 12325 ft.    Vertical TD: 7331 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/16/2018
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 100 FNL  460 FWL
Bottom Hole Location:Sec:11 Twp: 3N 68W Footage: 100 FNL  370 FEL
Proposed Depth/Form:12159 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 61, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12412 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1502, Top: , Bottom: 12412 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7027 ft., Depth: 12159 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/20/2017
Spud Date:10/26/2016Spud Date Is:ACTUAL
Measured TD:12325 ft.Measured PB depth:12276 ft.
True Vertical TD:7331 ft.True Vertical PB depth:7332 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 109 FNL  521 FWL
Bottom Hole Location:Sec:11 Twp: 3N 68WFootage: 93 FNL  367 FEL
Log Types:CBL, Mud Log, and MWD/LWD. (Triple combo in 123-39322).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1539 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 641, Top: 0 ft., Bottom: 1539 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12325 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1896, Top: 466 ft., Bottom: 12325 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3660 ft.3748 ft.NN
SUSSEX4120 ft.4274 ft.NN
SHANNON4633 ft.4666 ft.NN
SHARON SPRINGS7233 ft.NN
NIOBRARA7346 ft.NN
FORT HAYS7801 ft.NN
CODELL7867 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 7905 ft.    Interval Bottom: 12195 ft.

 Completed Information for Formation CODELL
1st Production Date:5/16/2017Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/17/2017Treatment End Date:4/28/2017
Treatment Summary:239,440 lbs 100 mesh; 4,194,058 lbs 20/40; 73075 bbls gel; Flowback determined from well test separator.
Total fluid used in treatment (bbls):73075Max pressure during treatment (psi):6364
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3918
Fresh water used in treatment (bbls):73075Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4433498Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:7432 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/18/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 345
BBLS_OIL 497
BTU_GAS 1319
CALC_BBLS_H2O 345
CALC_BBLS_OIL 497
CALC_GOR 954
CALC_MCF_GAS 474
CASING_PRESS 1700
GRAVITY_OIL 45
MCF_GAS 474
TUBING_PRESS 1300
Perforation Data:
Interval Top:7905 ft.# Of Holes:660
Interval Bottom:12195 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)437
Total Gas Produced (MCF)19707
GOR45096
GOR DeterminationMCFE
Average BOE per Day10.453
Average MCFE per Day60.610

 Federal Financial Assurance  i 

 Tribal Well  i No