Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39301
Well Classification: GW Status: PR - 5/1/2021
Well Name/No:SICKLER #27N-34HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:436868LocationID:436869
County:WELD #123Location:SWSE 34 2N67W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:363FSL  1497 FELLat/Long: 40.088506 / -104.873022Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.088505 / -104.873022Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/22/2014
End Date: 1/1/2015
Reported: 2/20/2015
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2021             Measured TD: 12981 ft.    Vertical TD: 7398 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/20/2016
Proposed Top PZ Location:Sec:34 Twp: 2N 67W Footage: 50 FSL  1500 FEL
Bottom Hole Location:Sec:34 Twp: 2N 67W Footage: 50 FNL  1500 FEL
Proposed Depth/Form:13001 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1208 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 460, Top: 0 ft., Bottom: 1208 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7807 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7807 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6806 ft., Depth: 13001 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/9/2014
Spud Date:5/27/2014Spud Date Is:ACTUAL
Measured TD:12981 ft.Measured PB depth:12981 ft.
True Vertical TD:7398 ft.True Vertical PB depth:7398 ft.
Top PZ Location:Sec:34 Twp: 2N 67WFootage: 78 FSL  1581 FEL
Bottom Hole Location:Sec:34 Twp: 2N 67WFootage: 52 FNL  1544 FEL
Log Types:CBL, GR, MUD, OH
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1299 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 503, Top: 0 ft., Bottom: 1299 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7817 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 265 ft., Bottom: 7817 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6830 ft., Depth: 12965 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4530 ft.
SHARON SPRINGS7352 ft.
NIOBRARA7449 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 5/1/2021                  Interval Top: 7870 ft.    Interval Bottom: 12981 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/17/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/22/2014Treatment End Date:1/1/2015
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7870-12,981. 54,896 BBL CROSSLINK GEL, 505 BBL LINEAR GEL, 23,042 BBL SLICKWATER, - 78,443 BBL TOTAL FLUID 2,852,250# 20/40 PREFERRED, - 2,852,250# TOTAL SAND."
Total fluid used in treatment (bbls):78443Max pressure during treatment (psi):8095
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2096
Fresh water used in treatment (bbls):78444Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2852250Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/24/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 153
BBLS_OIL 78
BTU_GAS 1258
CALC_BBLS_H2O 153
CALC_BBLS_OIL 78
CALC_GOR 1577
CALC_MCF_GAS 123
CASING_PRESS 1300
GRAVITY_OIL 45
MCF_GAS 123
Perforation Data:
Interval Top:7870 ft.# Of Holes:0
Interval Bottom:12981 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1936
Total Gas Produced (MCF)44800
GOR23140
GOR DeterminationMCFE
Average BOE per Day26.491
Average MCFE per Day153.640

 Federal Financial Assurance  i 

 Tribal Well  i No