Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39293
Well Classification: OW Status: PR - 6/1/2020
Well Name/No:NRC #29N-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2020
FacilityID:436854LocationID:436853
County:WELD #123Location:NENW 8 1N67W 6
Field:WATTENBERG - #90750Elevation:5035 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:612FNL  2035 FWLLat/Long: 40.071167 / -104.916638Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071168 / -104.916636Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/22/2014
End Date: 10/6/2014
Reported: 11/13/2014
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2020             Measured TD: 18522 ft.    Vertical TD: 7460 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2016
Proposed Top PZ Location:Sec:5 Twp: 1N 67W Footage: 52 FSL  1509 FWL
Bottom Hole Location:Sec:32 Twp: 2N 67W Footage: 17 FNL  1531 FWL
Proposed Depth/Form:18535 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7881 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7881 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6823 ft., Depth: 18535 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/29/2014
Spud Date:5/4/2014Spud Date Is:ACTUAL
Measured TD:18522 ft.Measured PB depth:18462 ft.
True Vertical TD:7460 ft.True Vertical PB depth:7462 ft.
Top PZ Location:Sec:5 Twp: 1N 67WFootage: 52 FSL  1509 FWL
Bottom Hole Location:Sec:32 Twp: 2N 67WFootage: 17 FNL  1531 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1238 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 437, Top: 0 ft., Bottom: 1238 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7924 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 7924 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6781 ft., Depth: 18511 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 6781 ft., Bottom: 18511 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4616 ft.
SHARON SPRINGS7462 ft.
NIOBRARA7580 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2020                  Interval Top: 7950 ft.    Interval Bottom: 18384 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/30/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/22/2014Treatment End Date:10/6/2014
Treatment Summary:"PERF AND FRAC FROM 7950-18,384 702 BBL ACID, 212,690 BBL SLICKWATER, 12,429 BBL WATER, - 225,821 BBL TOTAL FLUID 5,904,660# 40/70 OTTAWA/ST. PETERS, - 5,904,660# TOTAL SAND."
Total fluid used in treatment (bbls):225821Max pressure during treatment (psi):7303
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):702Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17511
Fresh water used in treatment (bbls):225119Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5904660Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BBLS_OIL 367
BTU_GAS 1342
CALC_BBLS_H2O 73
CALC_BBLS_OIL 367
CALC_GOR 1368
CALC_MCF_GAS 502
CASING_PRESS 1650
GRAVITY_OIL 50
MCF_GAS 502
Perforation Data:
Interval Top:7950 ft.# Of Holes:1200
Interval Bottom:18384 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1124
Total Gas Produced (MCF)43524
GOR38722
GOR DeterminationMCFE
Average BOE per Day23.495
Average MCFE per Day136.276

 Federal Financial Assurance  i 

 Tribal Well  i No