Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39285
Well Classification: OW Status: PR - 7/1/2022
Well Name/No:TROUDT #14N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2022
FacilityID:436834LocationID:436829
Municipality/County:FREDERICK / WELD #123Location:SESW 33 2N67W 6
Field:WATTENBERG - #90750Elevation:5037 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:305FSL  1590 FWLLat/Long: 40.088399 / -104.899644Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.088401 / -104.899643Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/23/2015
End Date: 10/16/2015
Reported: 12/4/2015
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2022             Measured TD: 12582 ft.    Vertical TD: 7557 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2016
Proposed Top PZ Location:Sec:4 Twp: 1N 67W Footage: 211 FNL  1653 FWL
Bottom Hole Location:Sec:33 Twp: 2N 67W Footage: 462 FNL  1722 FWL
Proposed Depth/Form:12546 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1104 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1104 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7905 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7905 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6900 ft., Depth: 12546 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2015
Spud Date:3/21/2015Spud Date Is:ACTUAL
Measured TD:12582 ft.Measured PB depth:12481 ft.
True Vertical TD:7557 ft.True Vertical PB depth:7560 ft.
Top PZ Location:Sec:4 Twp: 1N 67WFootage: 211 FNL  1653 FWL
Bottom Hole Location:Sec:33 Twp: 2N 67WFootage: 462 FNL  1722 FWL
Log Types:CBL, LWD, (IND in 123-08962, 123-07846)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 32, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1181 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 456, Top: 0 ft., Bottom: 1181 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12572 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1630, Top: 350 ft., Bottom: 12572 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4749 ft.
SHARON SPRINGS7395 ft.
NIOBRARA7482 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2022                  Interval Top: 7502 ft.    Interval Bottom: 12474 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/26/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/23/2015Treatment End Date:10/16/2015
Treatment Summary:"PERF AND FRAC FROM 7502-12,474. 667 BBL ACID, 280,083 BBL SLICKWATER, 5,068 BBL WATER, - 285,817 BBL TOTAL FLUID 13,953,926# 100 MESH ,,2,316,766# 40/70 GENOA/SAND HILLS, - 16,270,692# TOTAL SAND."
Total fluid used in treatment (bbls):285817Max pressure during treatment (psi):8353
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):667Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):1410Total flowback volume recovered (bbls):1348
Fresh water used in treatment (bbls):283740Disposition method For flowback:RECYCLE
Total proppant used (lbs):16270692Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 56
BBLS_OIL 44
BTU_GAS 1349
CALC_BBLS_H2O 56
CALC_BBLS_OIL 44
CALC_GOR 2182
CALC_MCF_GAS 96
CASING_PRESS 800
GRAVITY_OIL 50
MCF_GAS 96
Perforation Data:
Interval Top:7502 ft.# Of Holes:864
Interval Bottom:12474 ft.Hole Size:0.46 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)32
Total Gas Produced (MCF)2699
GOR84343
GOR DeterminationMCFE
Average BOE per Day1.362
Average MCFE per Day7.903

 Federal Financial Assurance  i 

 Tribal Well  i No