|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2022 Measured TD: 12835 ft. Vertical TD: 7707 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/19/2016 | Proposed Top PZ Location: | Sec:33 Twp: 2N 67W | Footage: 175 FSL 350 FWL | Bottom Hole Location: | Sec:33 Twp: 2N 67W | Footage: 460 FNL 350 FWL | Proposed Depth/Form: | 12877 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1104 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1104 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8231 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 870, Top: 0 ft., Bottom: 8231 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7229 ft., Depth: 12877 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/19/2015 | Spud Date: | 3/19/2015 | Spud Date Is: | ACTUAL | Measured TD: | 12835 ft. | Measured PB depth: | 12779 ft. | True Vertical TD: | 7707 ft. | True Vertical PB depth: | 7707 ft. | Top PZ Location: | Sec:33 Twp: 2N 67W | Footage: 221 FSL 361 FWL | Bottom Hole Location: | Sec:33 Twp: 2N 67W | Footage: 460 FNL 332 FWL | Log Types: | CBL, LWD, MUD, (IND in 123-08962, 123-07846) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: 42.1 , Citings Type: ACTUAL | Cement: | Sacks: 32, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1185 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 458, Top: 0 ft., Bottom: 1185 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8330 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 774, Top: 56 ft., Bottom: 8330 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7250 ft., Depth: 12825 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 380, Top: 7250 ft., Bottom: 12825 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4849 ft. | | | | SHARON SPRINGS | 7574 ft. | | | | NIOBRARA | 7605 ft. | | | | FORT HAYS | 8098 ft. | | | | CODELL | 8208 ft. | | | | CARLILE | 12584 ft. | | | |
Formation NFCC Formation Classification: OW Status: PR - 7/1/2022 Interval Top: 8230 ft. Interval Bottom: 12769 ft. Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | 1st Production Date: | 10/23/2015 | Choke Size: | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/30/2015 | Treatment End Date: | 10/17/2015 | Treatment Summary: | PERF AND FRAC FROM 8230-12,769.
36 BBL ACID, 77,678 BBL SLICKWATER, 2,084 BBL WATER, - 79,798 BBL TOTAL FLUID
2,344,792# 100 MESH , - 2,344,792# TOTAL SAND.
ENTERED CODELL 8230-8783; 9014-12,585
FT. HAYS 8787-8820; 8845-9014
NIOBRARA 8820-8845
CARLILE 12,585-12,769
THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
| Total fluid used in treatment (bbls): | 79798 | Max pressure during treatment (psi): | 6422 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 15 | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 450 | Total flowback volume recovered (bbls): | 4671 | Fresh water used in treatment (bbls): | 79312 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2344792 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/3/2015 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 234 | BBLS_OIL | 128 | BTU_GAS | 1349 | CALC_BBLS_H2O | 234 | CALC_BBLS_OIL | 128 | CALC_GOR | 719 | CALC_MCF_GAS | 92 | CASING_PRESS | 850 | GRAVITY_OIL | 50 | MCF_GAS | 92 |
| Perforation Data: | Interval Top: | 8230 ft. | # Of Holes: | 424 | Interval Bottom: | 12769 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 200 |
Total Gas Produced (MCF) | 3963 |
GOR | 19815 |
GOR Determination | MCFE |
Average BOE per Day | 2.421 |
Average MCFE per Day | 14.026 |
Federal Financial Assurance | i | |
|
|