|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/3/2015 Measured TD: 12595 ft. Vertical TD: 7514 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/3/2015 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/13/2016 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 725 FSL 1075 FWL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 400 FSL 1170 FWL | | Proposed Depth/Form: | 12876 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7905 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 448, Top: 500 ft., Bottom: 7905 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12876 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 201, Top: 7605 ft., Bottom: 12876 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2015 | | Spud Date: | 2/14/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12595 ft. | Measured PB depth: | 12570 ft. | | True Vertical TD: | 7514 ft. | True Vertical PB depth: | 7514 ft. | | Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 1067 FSL 1113 FWL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 372 FSL 1149 FWL | | Log Types: | MWD/CBL/(CDL, CNL, DIL run in API: 123-27346) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 880 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 342, Top: 0 ft., Bottom: 880 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7993 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 650 ft., Bottom: 7993 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 12595 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 5989 ft., Bottom: 12595 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7281 ft. | | | | | NIOBRARA | 7405 ft. | | | | | FORT HAYS | 7827 ft. | | | | | CODELL | 8053 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/13/2018 Interval Top: 8141 ft. Interval Bottom: 12474 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/13/2018 | Treatment End Date: | N/A | | Treatment Summary: | Stages 1-31 treated with 57,090 bbls of water, 70 bbls of 15% HCL acid and 2,599,496 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 57160 | Max pressure during treatment (psi): | 8086 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 31 | | Total acid used in treatment (bbls): | 70 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 11957 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 45133 | Disposition method For flowback: | | | Total proppant used (lbs): | 2599496 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8141 ft. | # Of Holes: | 785 | | Interval Bottom: | 12474 ft. | Hole Size: | 0.375 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 8/3/2015 Interval Top: 7996 ft. Interval Bottom: 12474 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 7/24/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/10/2015 | Treatment End Date: | 6/15/2015 | | Treatment Summary: | Stage 1 to 32 treated with total of 59,114 bbl fluid, 46,703 bbl fresh water, 70 bbl 15% HCL acid plus 278 bbl additives and 2,691,292 lb of 40/70 sand. | | Total fluid used in treatment (bbls): | 59114 | Max pressure during treatment (psi): | 8086 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 32 | | Total acid used in treatment (bbls): | 70 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 12063 | Total flowback volume recovered (bbls): | 1700 | | Fresh water used in treatment (bbls): | 46981 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2691292 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7608 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/3/2015 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 94 | | BBLS_OIL | 117 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 94 | | CALC_BBLS_OIL | 117 | | CALC_GOR | 2085 | | CALC_MCF_GAS | 244 | | CASING_PRESS | 1946 | | GRAVITY_OIL | 50 | | MCF_GAS | 244 | | TUBING_PRESS | 1539 |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 811 | | Interval Bottom: | 12474 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 4/13/2018 Interval Top: 7996 ft. Interval Bottom: 8095 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/13/2018 | Treatment End Date: | N/A | | Treatment Summary: | Stage 32 treated with 1,954 bbls of total fluid and 91,796 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 1954 | Max pressure during treatment (psi): | 7882 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 106 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 1848 | Disposition method For flowback: | | | Total proppant used (lbs): | 91796 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 26 | | Interval Bottom: | 8095 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1418 |
| Total Gas Produced (MCF) | 40539 |
| GOR | 28588 |
| GOR Determination | MCFE |
| Average BOE per Day | 22.876 |
| Average MCFE per Day | 132.690 |
| Federal Financial Assurance | i | |
|
|