Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39248
Well Classification: OW Status: PR - 9/1/2025
Well Name/No:SACK #28C-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:436757LocationID:318736
County:WELD #123Location:SESW 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5055 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:825FSL  1900 FWLLat/Long: 40.002606 / -104.935759Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002602 / -104.935762Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2015
End Date: 3/12/2015
Reported: 4/27/2015
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2025             Measured TD: 17421 ft.    Vertical TD: 7836 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/12/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 1408 FSL  2452 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67W Footage: 2 FNL  2456 FWL
Proposed Depth/Form:17434 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8252 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8252 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7249 ft., Depth: 17434 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/20/2015
Spud Date:8/14/2014Spud Date Is:ACTUAL
Measured TD:17421 ft.Measured PB depth:17367 ft.
True Vertical TD:7836 ft.True Vertical PB depth:7836 ft.
Top PZ Location:Sec:31 Twp: 1N 67WFootage: 1408 FSL  2452 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67WFootage: 2 FNL  2456 FWL
Log Types:CBL, MWD with GR, MUD, (IND and GR in API# 05-123-09845)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1295 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1295 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8242 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 8242 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7194 ft., Depth: 17416 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 7214 ft., Bottom: 17416 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5089 ft.
SHARON SPRINGS7458 ft.
NIOBRARA7488 ft.
FORT HAYS8126 ft.
CODELL8330 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/21/2017                 Interval Top: 8312 ft.    Interval Bottom: 17420 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2017Treatment End Date:N/A
Treatment Summary:CODELL 8312-9788; 9913-17420
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8312 ft.# Of Holes:1086
Interval Bottom:17420 ft.Hole Size:0.37 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 9/1/2025                  Interval Top: 8250 ft.    Interval Bottom: 17228 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/15/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2015Treatment End Date:3/12/2015
Treatment Summary:"PERF AND FRAC FROM 8250-17,228. 107 BBL ACID, 165,750 BBL SLICKWATER, 9,689 BBL WATER, - 175,546 BBL TOTAL FLUID 5,192,553# 40/70 GENOA/SAND HILLS, - 5,192,553# TOTAL SAND." ENTERED FT HAYS 8129-8311; 9788-9912; CODELL 8312-9788; 9913-17420 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):175546Max pressure during treatment (psi):7436
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):672
Fresh water used in treatment (bbls):175439Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5192553Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 245
BBLS_OIL 97
BTU_GAS 1168
CALC_BBLS_H2O 245
CALC_BBLS_OIL 97
CALC_GOR 1526
CALC_MCF_GAS 148
CASING_PRESS 1500
GRAVITY_OIL 50
MCF_GAS 148
Perforation Data:
Interval Top:8250 ft.# Of Holes:1086
Interval Bottom:17228 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/21/2017                 Interval Top: 8129 ft.    Interval Bottom: 9912 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2017Treatment End Date:N/A
Treatment Summary:ENTERED FT HAYS 8129-8311; 9788-9912
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8129 ft.# Of Holes:1086
Interval Bottom:9912 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)940
Total Gas Produced (MCF)29794
GOR31695
GOR DeterminationMCFE
Average BOE per Day16.954
Average MCFE per Day98.334

 Federal Financial Assurance  i 

 Tribal Well  i No