Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39244
Well Classification: OW Status: SI - 6/1/2025
Well Name/No:SACK STATE #30C-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2025
FacilityID:436737LocationID:436736
County:WELD #123Location:SWSW 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5065 ft.
Planned Location:825FSL  895 FWLLat/Long: 40.002606 / -104.939347Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002613 / -104.939345Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/13/2015
End Date: 2/25/2015
Reported: 4/13/2015
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 6/1/2025             Measured TD: 17415 ft.    Vertical TD: 7883 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/12/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 1390 FSL  332 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67W Footage: 19 FNL  349 FWL
Proposed Depth/Form:17465 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8266 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8266 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7261 ft., Depth: 17465 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/23/2014
Spud Date:8/12/2014Spud Date Is:ACTUAL
Measured TD:17415 ft.Measured PB depth:17361 ft.
True Vertical TD:7883 ft.True Vertical PB depth:7886 ft.
Top PZ Location:Sec:31 Twp: 1N 67WFootage: 1390 FSL  332 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67WFootage: 19 FNL  349 FWL
Log Types:CBL, GR, MUD, (DEN/NEU in API# 05-123-3465)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1264 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 512, Top: 0 ft., Bottom: 1264 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8208 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 480 ft., Bottom: 8208 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7121 ft., Depth: 17411 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 7121 ft., Bottom: 17411 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
SUSSEX5101 ft.
SHARON SPRINGS7461 ft.
NIOBRARA7494 ft.
FORT HAYS8151 ft.
CODELL10968 ft.
CARLILE15824 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 15824 ft.    Interval Bottom: 17415 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:CARLILE 15,824-17,415
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15824 ft.# Of Holes:1104
Interval Bottom:17415 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 10968 ft.    Interval Bottom: 15823 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:CODELL 10,968-11,022; 14,554-15,552; 15,702-15,823
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10968 ft.# Of Holes:1104
Interval Bottom:15823 ft.Hole Size:0.37 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 9897 ft.    Interval Bottom: 11329 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:NIOBRARA 9897-10,070; 11,092-11,329
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9897 ft.# Of Holes:1104
Interval Bottom:11329 ft.Hole Size:0.37 in.

Formation NFCC                     Formation Classification:  OW                     Status:  SI - 6/1/2025                  Interval Top: 8226 ft.    Interval Bottom: 17332 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:3/24/2015Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/25/2015
Treatment Summary:"PERF AND FRAC FROM 8226-17,332. 333 BBL ACID, 181,000 BBL SLICKWATER, 18,110 BBL WATER, - 199,443 BBL TOTAL FLUID 4,767,745# 40/70 GENOA/SAND HILLS, - 4,767,745# TOTAL SAND." WE ENTERED THE FT. HAYS 8147-9896; 10,070-10,967, 11,022-11,092; 11,330-14,553; 15,553-15702; NIOBRARA 9897-10,070; 11,092-11,329 CODELL 10,968-11,022; 14,554-15,552; 15,702-15,823 CARLILE 15,824-17,415 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):199443Max pressure during treatment (psi):7474
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):333Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17944
Fresh water used in treatment (bbls):199110Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4767745Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.625 in.Tubing Setting Depth:7862 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 318
BBLS_OIL 354
BTU_GAS 1168
CALC_BBLS_H2O 318
CALC_BBLS_OIL 354
CALC_GOR 2192
CALC_MCF_GAS 776
CASING_PRESS 2440
GRAVITY_OIL 50
MCF_GAS 776
TUBING_PRESS 1912
Perforation Data:
Interval Top:8226 ft.# Of Holes:1104
Interval Bottom:17332 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/9/2017                  Interval Top: 8147 ft.    Interval Bottom: 15702 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:FT. HAYS 8147-9896; 10,070-10,967, 11,022-11,092; 11,330-14,553; 15,553-15702;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8147 ft.# Of Holes:1104
Interval Bottom:15702 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)206
Total Gas Produced (MCF)3748
GOR18194
GOR DeterminationMCFE
Average BOE per Day2.317
Average MCFE per Day13.444

 Federal Financial Assurance  i 

 Tribal Well  i No