Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39244
Well Classification: OW Status: PR - 9/1/2025
Well Name/No:SACK STATE #30C-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:436737LocationID:436736
County:WELD #123Location:SWSW 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5065 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:825FSL  895 FWLLat/Long: 40.002606 / -104.939347Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002613 / -104.939345Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/13/2015
End Date: 2/25/2015
Reported: 4/13/2015
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2025             Measured TD: 17415 ft.    Vertical TD: 7883 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/12/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 1390 FSL  332 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67W Footage: 19 FNL  349 FWL
Proposed Depth/Form:17465 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8266 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 870, Top: 0 ft., Bottom: 8266 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7261 ft., Depth: 17465 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/23/2014
Spud Date:8/12/2014Spud Date Is:ACTUAL
Measured TD:17415 ft.Measured PB depth:17361 ft.
True Vertical TD:7883 ft.True Vertical PB depth:7886 ft.
Top PZ Location:Sec:31 Twp: 1N 67WFootage: 1390 FSL  332 FWL
Bottom Hole Location:Sec:30 Twp: 1N 67WFootage: 19 FNL  349 FWL
Log Types:CBL, GR, MUD, (DEN/NEU in API# 05-123-3465)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1264 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 512, Top: 0 ft., Bottom: 1264 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8208 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 480 ft., Bottom: 8208 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7121 ft., Depth: 17411 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 7121 ft., Bottom: 17411 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
SUSSEX5101 ft.
SHARON SPRINGS7461 ft.
NIOBRARA7494 ft.
FORT HAYS8151 ft.
CODELL10968 ft.
CARLILE15824 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 15824 ft.    Interval Bottom: 17415 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:CARLILE 15,824-17,415
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15824 ft.# Of Holes:1104
Interval Bottom:17415 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 10968 ft.    Interval Bottom: 15823 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:CODELL 10,968-11,022; 14,554-15,552; 15,702-15,823
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10968 ft.# Of Holes:1104
Interval Bottom:15823 ft.Hole Size:0.37 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/9/2017                  Interval Top: 9897 ft.    Interval Bottom: 11329 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:NIOBRARA 9897-10,070; 11,092-11,329
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9897 ft.# Of Holes:1104
Interval Bottom:11329 ft.Hole Size:0.37 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 9/1/2025                  Interval Top: 8226 ft.    Interval Bottom: 17332 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:3/24/2015Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2015Treatment End Date:2/25/2015
Treatment Summary:"PERF AND FRAC FROM 8226-17,332. 333 BBL ACID, 181,000 BBL SLICKWATER, 18,110 BBL WATER, - 199,443 BBL TOTAL FLUID 4,767,745# 40/70 GENOA/SAND HILLS, - 4,767,745# TOTAL SAND." WE ENTERED THE FT. HAYS 8147-9896; 10,070-10,967, 11,022-11,092; 11,330-14,553; 15,553-15702; NIOBRARA 9897-10,070; 11,092-11,329 CODELL 10,968-11,022; 14,554-15,552; 15,702-15,823 CARLILE 15,824-17,415 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL (SEE ATTACHMENT)
Total fluid used in treatment (bbls):199443Max pressure during treatment (psi):7474
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):333Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17944
Fresh water used in treatment (bbls):199110Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4767745Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.625 in.Tubing Setting Depth:7862 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 318
BBLS_OIL 354
BTU_GAS 1168
CALC_BBLS_H2O 318
CALC_BBLS_OIL 354
CALC_GOR 2192
CALC_MCF_GAS 776
CASING_PRESS 2440
GRAVITY_OIL 50
MCF_GAS 776
TUBING_PRESS 1912
Perforation Data:
Interval Top:8226 ft.# Of Holes:1104
Interval Bottom:17332 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/9/2017                  Interval Top: 8147 ft.    Interval Bottom: 15702 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/9/2017Treatment End Date:N/A
Treatment Summary:FT. HAYS 8147-9896; 10,070-10,967, 11,022-11,092; 11,330-14,553; 15,553-15702;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8147 ft.# Of Holes:1104
Interval Bottom:15702 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)352
Total Gas Produced (MCF)3513
GOR9980
GOR DeterminationBOE
Average BOE per Day2.635
Average MCFE per Day15.307

 Federal Financial Assurance  i 

 Tribal Well  i No