Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39206
Well Classification: OW Status: PR - 7/1/2022
Well Name/No:RMF #30N-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2022
FacilityID:436637LocationID:436638
Municipality/County:MEAD / WELD #123Location:NENE 15 3N68W 6
Field:WATTENBERG - #90750Elevation:4970 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:751FNL  602 FELLat/Long: 40.231386 / -104.981860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.231389 / -104.981860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/29/2016
End Date: 6/3/2016
Reported: 7/14/2016
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2022             Measured TD: 12321 ft.    Vertical TD: 7180 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/4/2016
Proposed Top PZ Location:Sec:15 Twp: 3N 68W Footage: 251 FNL  160 FEL
Bottom Hole Location:Sec:15 Twp: 3N 68W Footage: 211 FNL  471 FWL
Proposed Depth/Form:11867 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1067 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 1067 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7598 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 0 ft., Bottom: 7598 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6593 ft., Depth: 12248 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/29/2016
Spud Date:11/21/2015Spud Date Is:ACTUAL
Measured TD:12321 ft.Measured PB depth:12219 ft.
True Vertical TD:7180 ft.True Vertical PB depth:7174 ft.
Top PZ Location:Sec:15 Twp: 3N 68WFootage: 251 FNL  160 FEL
Bottom Hole Location:Sec:15 Twp: 3N 68WFootage: 211 FNL  471 FWL
Log Types:CBL, MWD, (IND in 123-39204)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 36, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1882 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 752, Top: 0 ft., Bottom: 1882 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12310 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1118, Top: 446 ft., Bottom: 12310 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4131 ft.
SHARON SPRINGS7169 ft.
NIOBRARA7261 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2022                  Interval Top: 7670 ft.    Interval Bottom: 12208 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/14/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2016Treatment End Date:6/3/2016
Treatment Summary:"PERF AND FRAC FROM 7670-12,208. 19 BBL 7.5% HCL ACID, 123,016 BBL SLICKWATER, 4,056 BBL WATER, - 127,091 BBL TOTAL FLUID 554,666# 100 MESH, 3,085,518# 40/70 PREMIUM, - 3,640,184# TOTAL SAND."
Total fluid used in treatment (bbls):127091Max pressure during treatment (psi):7189
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):19Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7864
Fresh water used in treatment (bbls):127072Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3640185Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 136
BTU_GAS 1358
CALC_BBLS_OIL 136
CALC_GOR 1978
CALC_MCF_GAS 269
CASING_PRESS 1375
GRAVITY_OIL 48
MCF_GAS 269
Perforation Data:
Interval Top:7670 ft.# Of Holes:552
Interval Bottom:12208 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1585
Total Gas Produced (MCF)22371
GOR14114
GOR DeterminationBOE
Average BOE per Day14.927
Average MCFE per Day86.578

 Federal Financial Assurance  i 

 Tribal Well  i No