Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39169
Well Classification: OW Status: TA - 1/1/2026
Well Name/No:Guttersen #6R-403
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date1/1/2026
FacilityID:436520LocationID:434585
County:WELD #123Location:NWNE 6 2N63W 6
Field:WATTENBERG - #90750Elevation:4836 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:75FNL  2104 FELLat/Long: 40.174460 / -104.478450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174466 / -104.478470Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/14/2014
End Date: 11/19/2014
Reported: 2/18/2016
Originally Reported: 11/26/2014
Days to report: 456
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 1/1/2026             Measured TD: 11233 ft.    Vertical TD: 6826 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/22/2016
Proposed Top PZ Location:Sec:6 Twp: 2N 63W Footage: 734 FNL  1481 FWL
Bottom Hole Location:Sec:6 Twp: 2N 63W Footage: 500 FSL  1475 FEL
Proposed Depth/Form:11265 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7414 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7414 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6093 ft., Depth: 11265 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/7/2014
Spud Date:7/29/2014Spud Date Is:ACTUAL
Measured TD:11233 ft.Measured PB depth:11225 ft.
True Vertical TD:6826 ft.True Vertical PB depth:6826 ft.
Top PZ Location:Sec:6 Twp: 2N 63WFootage: 864 FNL  1494 FEL
Bottom Hole Location:Sec:6 Twp: 2N 63WFootage: 502 FSL  1471 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 888 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 888 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7304 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 622, Top: 1970 ft., Bottom: 7304 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7107 ft., Depth: 11229 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3681 ft.
SUSSEX4091 ft.
SHARON SPRINGS6329 ft.
NIOBRARA6638 ft.
FORT HAYS7353 ft.
CODELL7709 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/26/2019                 Interval Top: 7709 ft.    Interval Bottom: 11233 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/26/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,709'-11,233'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7709 ft.# Of Holes:
Interval Bottom:11233 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  TA - 1/1/2026                  Interval Top: 7353 ft.    Interval Bottom: 11233 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/4/2014Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/14/2014Treatment End Date:11/19/2014
Treatment Summary:16 Stage Plug and Perf, Swell Packer set at 7,353' Total Fluid: 68,553 bbls Gel Fluid: 53,456 bbls Slickwater Fluid: 15,097 bbls Total Proppant: 3,516,720 lbs Silica Proppant: 3,516,720 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):68553Max pressure during treatment (psi):5720
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.06
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5991
Fresh water used in treatment (bbls):68553Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3516720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6892 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/16/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 179
BBLS_OIL 162
BTU_GAS 1456
CALC_BBLS_H2O 179
CALC_BBLS_OIL 162
CALC_GOR 691
CALC_MCF_GAS 112
CASING_PRESS 902
GRAVITY_OIL 42
MCF_GAS 112
TUBING_PRESS 399
Perforation Data:
Interval Top:7353 ft.# Of Holes:
Interval Bottom:11233 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/26/2019                 Interval Top: 7353 ft.    Interval Bottom: 7709 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:3/26/2019Treatment End Date:N/A
Treatment Summary:Completed Depths; 7,353'-7,709'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7353 ft.# Of Holes:
Interval Bottom:7709 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/24/2025
Defined Inactive (TA)YLast Production
07/18/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No